Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
A/R And M/O Akashwani Bhawan, New Delhi During The Year 2024 25.(Sh : Replacing The Damaged Carpet Flooring With Wooden Flooring In Ddg(f) Chamber At Akashwani Bhawan, New Delhi.)
|
| Description |
A/R And M/O Akashwani Bhawan, New Delhi During The Year 2024 25.(Sh : Replacing The Damaged Carpet Flooring With Wooden Flooring In Ddg(f) Chamber At Akashwani Bhawan, New Delhi.)
|
| Organisation | Prasar Bharati, Broadcasting Corporation of India | Autonomous Bos |
| Tender Id | 2024_PrasarBharati_25328 |
|
Reference Number |
28/EE(C)MHPD/AKB/2024-25/06 |
| Tender Fee | 0 |
| EMD | 2026 |
| Tender Value | - |
| Place | Delhi |
| Link |
View Original Tender Notice
https://prasarbharati.eproc.in |
| Start Date | September 30, 2024 19:00 |
| End Date |
Expired
04/10/2024
Expired 739 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing chemical treatment over university head quarters building terrace area and replacing damaged wall paneling in vice-chancellor chamber at madhavaram milk colony, chennai-51.
As per boq
Read moreGypsum ceiling,fibre acoustical suspended ceiling system,side walls treatment,acoustical natural rubber wood wall panelling,stretch fabric acoustical wall system,structure in front of stage,acoustical stage wooden flooring, providing and fixing stage wooden flooring,fire cum acoustical sound reducing doors providing,carpet,providing fixing of stair edging trims,thick wooden nosing made,providing and fixing of side skirting wooden beading,horizontal main curtain,horizontal rear curtain,stage frills,stage wings,grid structure,cyclorama frame with matt white projector screen,cable trays,fabrication on stage catwalk,supply installation,modular wired fixed heavy-duty stage lighting bar system,front of house light bar,side ladder,beam moving head light double prisms,54x3w,200w cob,200w cob led studio light,4 eyes cob led blinder light,200w fresnel light with barndoor input,200w led profiles,follow spot 7r,non-waterproof flood light,splitter 8 channel,mini pearl 1024 lighting controller,dmx fog,dj power fog oil,cabl
Gypsum ceiling,fibre acoustical suspended ceiling system,side walls treatment,acoustical natural rubber wood wall panelling,stretch fabric acoustical wall system,structure in front of stage,acoustical stage wooden flooring, providing and fixing stage wooden flooring,fire cum acoustical sound reducing doors providing,carpet,providing fixing of stair edging trims,thick wooden nosing made,providing and fixing of side skirting wooden beading,horizontal main curtain,horizontal rear curtain,stage frills,stage wings,grid structure,cyclorama frame with matt white projector screen,cable trays,fabrication on stage catwalk,supply installation,modular wired fixed heavy-duty stage lighting bar system,front of house light bar,side ladder,beam moving head light double prisms,54x3w,200w cob,200w cob led studio light,4 eyes cob led blinder light,200w fresnel light with barndoor input,200w led profiles,follow spot 7r,non-waterproof flood light,splitter 8 channel,mini pearl 1024 lighting controller,dmx fog,dj power fog oil,cabl
Read moreSound card,analog usb audio mixer,monitor speaker pair,condenser microphone,dynamic microphone,table top mic stand,headphones,headphone distribution amplifier,audio distribution amplifier,pc workstation,radio automation software,radio logger software,handy recorder,on air light,single channel telephone hybrid,digital clock,equipment rack 19 ru,network switch,fm transmitter 50 watt,fm antenna system 2 way dipole,dummy load 100 watt,30 mtrs. tower,rf coaxial cable 7 8 with connector,audio processor,wall acoustical treatment,wooden soundproof door with frame,false celling with acoustical treatment,carpet flooring,chair,studio table,table for staff in tv room,10 kva silent generator with junction box,15 kva stablizer,3kva online ups with battery backup,split ac 1 ton,celling light,electrical wiring and installation with dg wiring,earthing pit 02 for dg 02 for tower 01 for studio,installation and commissioning charges with material,liaisoning charges end to end including application fees comma sacfa clearance fees
Sound card,analog usb audio mixer,monitor speaker pair,condenser microphone,dynamic microphone,table top mic stand,headphones,headphone distribution amplifier,audio distribution amplifier,pc workstation,radio automation software,radio logger software,handy recorder,on air light,single channel telephone hybrid,digital clock,equipment rack 19 ru,network switch,fm transmitter 50 watt,fm antenna system 2 way dipole,dummy load 100 watt,30 mtrs. tower,rf coaxial cable 7 8 with connector,audio processor,wall acoustical treatment,wooden soundproof door with frame,false celling with acoustical treatment,carpet flooring,chair,studio table,table for staff in tv room,10 kva silent generator with junction box,15 kva stablizer,3kva online ups with battery backup,split ac 1 ton,celling light,electrical wiring and installation with dg wiring,earthing pit 02 for dg 02 for tower 01 for studio,installation and commissioning charges with material,liaisoning charges end to end including application fees comma sacfa clearance fees
Read moreReplacing damaged flooring arsd
Replacing damaged flooring classrooms labs at arsd college(stone flooring) at sdc.
Read moreA/r and m/o) akashwani bhawan, new delhi during the year 2024-25. (sh: replacing the damaged glass mossiac tiles of fountain at akashwani bhawan, new delhi).
A/r and m/o) akashwani bhawan, new delhi during the year 2024-25. (sh: replacing the damaged glass mossiac tiles of fountain at akashwani bhawan, new delhi).
Read moreRepairs and renovation of ddg and dlls chamber for deep bhawan, chennai.
Repairs and renovation of ddg and dlls chamber for deep bhawan, chennai.
Read moreReplacing of wornout wooden flooring along with carpet and other improvement works in new conference hall at centenary building
Replacing of wornout wooden flooring along with carpet and other improvement works in new conference hall at centenary building
Read moreRepairs to damaged wooden flooring in the office chamber of ce cid wing kashmir
Repairs to damaged wooden flooring in the office chamber of ce cid wing kashmir
Read moreCarpet flooring for office 6 feet 4 feet,carpet flooring for office 5 feet 3 feet,revolving chair f
Read more
Renovation in the chamber of sr. ddg (paf), room no.-405, at dak bhawan, new delhi.
Renovation in the chamber of sr. ddg (paf), room no.-405, at dak bhawan, new delhi.
Read moreof your Industry type