Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Boundary Wall On Left Bank Of Trunk Drain No. I Between Rd 0m To Rd 1940m.(Balance Work).
|
Description |
Construction Of Boundary Wall On Left Bank Of Trunk Drain No. I Between Rd 0m To Rd 1940m.(Balance Work).
|
Organisation | Irrigation and Flood Control | State Govt. and UT |
Tender Id | 2024_IFC_252422_1 |
Reference Number |
84/EE/CD-III/IFC/2023-24/ |
Tender Fee | 0 |
EMD | 1.49 Lakh |
Tender Value | |
Place | Delhi |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329805 |
Start Date | January 23, 2024 00:25 |
End Date |
29/01/2024 ( Expired 468 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConstruction of cc drain at ward no. 02 nandlal kol house to main road.
Construction of cc drain at ward no. 02 nandlal kol house to main road.
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of w.b.m. road work at mokshdham to main road, ward no. 14, chhapara
Construction of w.b.m. road work at mokshdham to main road, ward no. 14, chhapara
Read moreProvn of retaining wall and drain between certain unit locations in the aor of age b/r-ii under ge 864 ews, job no w/evi-06/bb cantt/2024-25
Cwek/token-16/864 ews/2025-26 provn of retaining wall and drain between certain unit locations in the aor of age b/r-ii under ge 864 ews, job no w/evi-06/bb cantt/2024-25
Read moreConstruction of r.c.c. drain from house of moti yadav to amalvi at ward no. 21 chhindwara
Construction of r.c.c. drain from house of moti yadav to amalvi at ward no. 21 chhindwara
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreof your Industry type