Tender Details

Particulars Details
Title
Wbphed/ Ee/Hd/N Ie T 14 Of 2024 25
Description
Sinking Of 1 (One) Nos. 250 X 150 Mm Dia And 230 M Deep Tubewell Drilling By Direct Rotary Method With Upvc Pipe (Cd) And Upvc Deep Well Screen (Rds) All Complete At Chandrapur Pwss At Amta I Block Under Uluberia Sub Division .(Location Maheshguha)
Organisation PHE | State Govt. and UT
Tender Id 2024_PHED_777261_4
Reference
Number
WBPHED/ EE/HD/NIeT-14 OF 2024-25
Tender Fee 0
EMD 29100
Tender Value
Place Howrah
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1721587
Start Date December 02, 2024 21:30
End Date

17/12/2024 ( Expired 149 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.

Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.

Read more
Wbphed/ ee/hd/niet-01 of 2025-26

Additional tube well of 250 x 150 mm dia and 230 m deep by direct rotary method with upvc pipes all complete at vill- moyrachack of amta-ii block under uttar dakhin bhatora pwss under uluberia sub-division, under howrah division p.h.e. dte.

Read more
Wbphed/ee/bd-i/24-25/niet29_14

Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using upvc pipe and upvc deep well screen (rds) filter at paschimrampur pwss (tw - iii site) within bhagwangola-i block under jal jeevan mission in connection

Read more
Construction of sinking of one no tubewell 140 mtr deep by dr method with upvc pipe and upvc ribbed strainer at inside dackbanglo pump station ward 17 under krishnanagar municipality

Construction of sinking of one no tubewell 140 mtr deep by dr method with upvc pipe and upvc ribbed strainer at inside dackbanglo pump station ward 17 under krishnanagar municipality

Read more
Drilling of combination well 350 150 mm dia 60 mtr deep gravel packed tubewell and 150 mm dia 60 mtr deep ordinary t.w. total 120 mtr depth 200 nos. by combination rig for piped water supply schemes in various villages of, balaghat district

Drilling of combination well 350 150 mm dia 60 mtr deep gravel packed tubewell and 150 mm dia 60 mtr deep ordinary t.w. total 120 mtr depth 200 nos. by combination rig for piped water supply schemes in various villages of, balaghat&amp#x0d district &amp#x0d

Read more
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Read more
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Read more
Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise