Tender Details

Particulars Details
Title
Foundation Work For Commissioning Of New Fire Engines In Lakhimpur Kheri Bottling Plant
Description
Foundation Work For Commissioning Of New Fire Engines In Lakhimpur Kheri Bottling Plant
Organisation IndianOil | Central Govt. Ministry/Department
Tender Id 2024_UPSO2_175579_1
Reference
Number
LKM/2023-2024/FE INSTALLATION
Tender Fee 0
EMD 0
Tender Value
Place Lakhimpur Kheri
Link https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=185678
Start Date February 22, 2024 14:30
End Date

01/03/2024 ( Expired 465 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Completion of incomplete work of provn of 01 mw solar power plant work at vadodara

Completion of incomplete work of provn of 01 mw solar power plant work at vadodara

Read more
Supply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations

Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh

Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh

Read more
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise