Tender Details

Particulars Details
Title
Soil Investigation For Preparation
Description
Soil Investigation For Preparation Of Dpr For Proposed Construction Of Two Storied New Office Building Of Bl And Lro, Kalyani With Provision Of Four Storied Foundation At Kalyani, Nadia Under Kalyani Construction Sub Division
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_897183_2
Reference
Number
WBPWD/AE/KCSD/e-NIT-04/2025-26
Tender Fee 0
EMD 2549
Tender Value -
Place Kalyani
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2023232

Start Date September 02, 2025 16:30
End Date
Expired 09/09/2025

Expired 398 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).

Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).

Read more
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call

Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call

Read more
Preparation of bathukamma play grounds for bathukamma festival at hasanparthy in division no.66

Preparation of bathukamma play grounds for bathukamma festival at hasanparthy in division no.66

Read more
Selection of an agency for preparation of economic master plan for pataliputra greenfield satellite township in bihar

Selection of an agency for preparation of economic master plan for pataliputra greenfield satellite township in bihar

Read more
Preparation of bahukamma play grounds for bathukamma festival at rajajinagar, nehurunagar, ram nagar in division no.52

Preparation of bahukamma play grounds for bathukamma festival at rajajinagar, nehurunagar, ram nagar in division no.52

Read more
Request for selection of consultant for the preparation of dpr for sasaram storm water drainage system phase - 2

Request for selection of consultant for the preparation of dpr for sasaram storm water drainage system phase - 2

Read more
Estimate for preparation of gate operation schedule for vattivagu project near pahadibanada (v), asifabad(m), kumuram bheem asifabad (district)

Estimate for preparation of gate operation schedule for vattivagu project near pahadibanada (v), asifabad(m), kumuram bheem asifabad (district)

Read more
Preparation of bathukamma paly grounds at arkasai kunta, jawahar nagar community hall for bathukamma festival in division no.56

Preparation of bathukamma paly grounds at arkasai kunta, jawahar nagar community hall for bathukamma festival in division no.56

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Estimate for preparation of gate operation schedule for sri komuram bheem project near ada (v), asifabad(m), kumuram bheem asifabad (district)

Estimate for preparation of gate operation schedule for sri komuram bheem project near ada (v), asifabad(m), kumuram bheem asifabad (district)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise