Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Raising Of Boundary Wall Including Construction Of Retaining Walls Adjacent To South East Side Storm Sewer Drain In Csir Nml Housing Complex, Agrico For The Year 2024 25 And 2025 26.
|
| Description |
Raising Of Boundary Wall Including Construction Of Retaining Walls Adjacent To South East Side Storm Sewer Drain In Csir Nml Housing Complex, Agrico For The Year 2024 25 And 2025 26.
|
| Organisation | Council of Scientific and Industrial Research | Public Sector Undertakings |
| Tender Id | 2025_CSIR_239965_1 |
|
Reference Number |
NML/ENG./WSM/eNIT/06(04)/25-26 |
| Tender Fee | 0 |
| EMD | 3.48 Lakh |
| Tender Value | - |
| Place | CSIR-NML, Jamshedpur |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=273065 |
| Start Date | July 12, 2025 15:00 |
| End Date |
Expired
02/08/2025
Expired 439 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing paver block road and storm water drain raising works at mandhaiamman koil street east in ward no 6.
Providing paver block road and storm water drain raising works at mandhaiamman koil street east in ward no 6.
Read moreBypass the w/s line passing through sewer manhole to avoid contamination of water and raising of depressed sewer / storm machine holes and road gullies along with other allied works in kishangarh under the charge of sde mcph sub divn no.20 chd.
Bypass the w/s line passing through sewer manhole to avoid contamination of water and raising of depressed sewer / storm machine holes and road gullies along with other allied works in kishangarh under the charge of sde mcph sub divn no.20 chd.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreRaising of boundary wall including construction of retaining walls adjacent to south-east side storm-sewer drain in csir-nml housing complex, agrico for the year 2024-25 and 2025-26
Raising of boundary wall including construction of retaining walls adjacent to south-east side storm-sewer drain in csir-nml housing complex, agrico for the year 2024-25 and 2025-26
Read moreAnnual contract for cleaning and associated up-keeping, garbage removal and cleaning of overhead water tanks, sumps in csir-nml, agrico housing complex and csir-nml sports ground area at agrico for the year 2024-25 and 2025-26.
Annual contract for cleaning and associated up-keeping, garbage removal and cleaning of overhead water tanks, sumps in csir-nml, agrico housing complex and csir-nml sports ground area at agrico for the year 2024-25 and 2025-26.
Read moreAnnual contract for cleaning and associated up-keeping, garbage removal and cleaning of overhead water tanks, sumps in csir-nml, agrico housing complex and csir-nml sports ground area at agrico for the year 2025-26 and 2026-27
Annual contract for cleaning and associated up-keeping, garbage removal and cleaning of overhead water tanks, sumps in csir-nml, agrico housing complex and csir-nml sports ground area at agrico for the year 2025-26 and 2026-27
Read morePreventive maint of sewer network, storm water drains, compound walls, fe3ncing, retaining walls and certains misc b/r works varanasi cantt under ge (east) prayagraj
Preventive maint of sewer network, storm water drains, compound walls, fe3ncing, retaining walls and certains misc b/r works varanasi cantt under ge (east) prayagraj
Read moreRaising, repairs and restoration of boundary wall in lstf pilot plant area of csir- nml, jamshedpur.
Raising, repairs and restoration of boundary wall in lstf pilot plant area of csir- nml, jamshedpur.
Read moreRaising, repairs and restoration of boundary wall in lstf pilot plant area of csir- nml, jamshedpur
Raising, repairs and restoration of boundary wall in lstf pilot plant area of csir- nml, jamshedpur
Read moreof your Industry type