Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Re Tender Restoration Estimate For Kwa Pipe Line Trenching Work In Meenachil Kaduthuruthy Road Ch 0/000 4/000 Km General Civil Work
|
Description |
Re Tender Restoration Estimate For Kwa Pipe Line&Amp#X0d
Trenching Work In Meenachil Kaduthuruthy&Amp#X0d
Road Ch 0/000 4/000 Km General Civil&Amp#X0d
Work
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_763968_1 |
Reference Number |
PWD/RB/TR/19948/2023_5_1_1/1 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | KADUTHURUTHY |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1250600 |
Start Date | May 30, 2025 23:30 |
End Date |
06/06/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreLac-ads-providing paving of tiles in anganavadi varnamnagar-improvements to aganavadi varnamnagar road in ward 19 of edathala grama panchayath.-general civil work
Very&#x0d pathetic condition due to waterlogged area .this&#x0d estimate is proposed to upgrade the road&#x0d with 100 mm interlocking tile works and&#x0d provisions for earth filling, gsb, wmm,pcc ,&#x0d dr masonary and naming board are inluded in&#x0d this estimate.
Read moreRestoration protection work from km 179870 to km 179930 railway ch. 8478 km 181000 to km. 181025 railway ch. 8578 along the pathankot-joginder nagar railway line, on the shimla mataur corridor in the state of himachal pradesh on item rate
Restoration protection work from km 179870 to km 179930 railway ch. 8478 km 181000 to km. 181025 railway ch. 8578 along the pathankot-joginder nagar railway line, on the shimla mataur corridor in the state of himachal pradesh on item rate
Read moreProviding road marking and road furniture in km 2/0-6/2 for the work of forming byepass to tiruchengode town km 0/0-6/2 (phase-i).
Providing road marking and road furniture in km 2/0-6/2 for the work of forming byepass to tiruchengode town km 0/0-6/2 (phase-i).
Read moreProviding road marking and road furniture in km 0/0-2/0 for the work of forming byepass to tiruchengode town km 0/0-6/2 (phase-i).
Providing road marking and road furniture in km 0/0-2/0 for the work of forming byepass to tiruchengode town km 0/0-6/2 (phase-i).
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreD e p o s i t - p v i p - c o n s t r u c t i o n o f s i d e protection wall between ch. 0/930 km 1/103 km of kalamboor md-general civil work
This estimate includes 1. clearing grass 2.&#x0d earthwork excavation, 3. pcc foundation cc&#x0d 1 4 8, 4. centering and shuttering 5. pcc side&#x0d wall cc 1 2 4, 6. dismantling dr.
Read morePeriodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Periodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Read moreGeneral-krsa -road safety rectification of paravoor bypass road in nh 544 for avoiding traffic congestion-work general civil work
Provisions for earth work&#x0d excavation, loosening and compacting, gsb,&#x0d wmm, prime coat, tack coat, dbm, bc, road&#x0d protection work,water barrier, ohm and road&#x0d marking etc are included in this estimate.
Read moreof your Industry type