Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kmc/Ltg/Crm/Apc/Ss1/2023 24
|
| Description |
Renovation Of Air Pollution Control System Connected With Electric Furnaces No. 1 And 2 At Sahanagar Burning Ghat And Interconnected Duct Line With Electric Furnaces No. 7 And 8 (Phase I) Under Kmc.
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_KMC_564191_1 |
|
Reference Number |
KMC/LTG/CRM/APC/SS1/2023-24 |
| Tender Fee | 0 |
| EMD | 1.28 Lakh |
| Tender Value | 0 |
| Place | Office of the D.G. (Electrical) |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 11, 2023 19:30 |
| End Date |
Expired
27/09/2023
Expired 1001 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
110 v dc green colour low intensity led lamps with holder assembly and cover to be used as hlc-1 on command and hlc-2 on command in complete panel d with panel plate drawing no.clw/es/3/sk-1/0453 alt. 1 or latest and indication lamp & illuminated push button spec. no. clw/es/3/0072 alt. i or latest for three phase wap-7 locomotive.
For complete deion and other details, please refer to tender
Read moreKmc/ltg/crm/bbg/aq/e-03/23-24
Renovation of air pollution control system connected with furnace no. 1 and 2 at birjunallah burning ghat, under kmc.
Read morekmc/ltg/crm/sbg/o_m/1/23-
Operation and maintenance of air pollution control device connected with electric furnace 1 and 2 (phase-i) at shanagar burning ghat.
Read moreKmc/ltg/crm/sbg/o_m/2/23-24
Operation and maintenance of air pollution control device connected with electric furnace 3 and 4 (phase -ii) at shanagar burning ghat.
Read moreKmc/nbg/ltg/crm/om/01(i)/24-25 (for2nd call)
Operation and maintenance of air pollution control devices connected with furnace no- 3and4 in old complex of nimtala burning ghat
Read moreKmc/ltg/crm/62/sbg/24-25
Renovation of electric furnace no. 7 and allied works for smooth functioning of connected air pollution control device at shanagar burning ghat.
Read moreKmc/nbg/ltg/crm/e-15/24-25
Renovation of horizontal and vertical brick duct connected to the air pollution control devices of furnace no. 1 and 2 at the new complex of nimtala burning ghat.
Read moreKmc/nbg/ltg/crm/e-20/24-25
Renovation of horizontal and vertical brick duct connected to the air pollution control devices of furnace no. 7 and 8 and allied works at the new complex of nimtala burning ghat
Read moreSupply, installation, commissioning of air pollution control system with operation and maintenance for 1 year at mokshdham ghat, gangabai ghat, and manewada ghat
Supply, installation, commissioning of air pollution control system with operation and maintenance for 1 year at mokshdham ghat, gangabai ghat, and manewada ghat
Read moreSupply, installation, commissioning of air pollution control system with operation and maintenance for 1 year at mokshdham ghat, gangabai ghat, and manewada ghat.
Supply, installation, commissioning of air pollution control system with operation and maintenance for 1 year at mokshdham ghat, gangabai ghat, and manewada ghat.
Read moreof your Industry type