Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constraction Of Pcc Road From Nachda Thakur Than To Icds Center
|
| Description |
Constraction Of Pcc Road From Nachda Thakur Than To Icds Center
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2026_ZPHD_987705_2 |
|
Reference Number |
E03/JGM/JAM/PARIHATI |
| Tender Fee | 500 |
| EMD | 5100 |
| Tender Value | - |
| Place | nachda |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2412618 |
| Start Date | January 14, 2026 23:30 |
| End Date |
Expired
24/01/2026
Expired 263 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mrl03-kesharibari high school to kesharibari icds center under sitai block
Mrl03-kesharibari high school to kesharibari icds center under sitai block , pkg wb06513
Read moreAdditional improvement work to icds center at srinivasa nagar in ward no 100, south zone.
Additional improvement work to icds center at srinivasa nagar in ward no 100, south zone.
Read moreConstruction of a pcc road and drain in ward no. 28 of bettiah municipal corporation, stretching from manmohan hatha—passing by the residences of anil dutt jha, pratima jha, and bn jha—up to the residence of vivekananda thakur.
Construction of a pcc road and drain in ward no. 28 of bettiah municipal corporation, stretching from manmohan hatha—passing by the residences of anil dutt jha, pratima jha, and bn jha—up to the residence of vivekananda thakur.
Read moreConstruction of pcc road in kendua bazar from mahendra gupta shop to arun khandelwal shop via azad chowk,thakur baadi road,in machhli patti from ganga gupta shop to kali mandir, in eb section from vishal house to ravi chai dukan,pankaj house to chhap
Construction of pcc road in kendua bazar from mahendra gupta shop to arun khandelwal shop via azad chowk,thakur baadi road,in machhli patti from ganga gupta shop to kali mandir, in eb section from vishal house to ravi chai dukan,pankaj house to chhap
Read moreWaterproof 7 course,bld pnt exterior,dismantl pcc,dismantl rcc,dismantl brick mason,dismantl plaster,dismantl door window,brk msn ab pl cs c40,pcc plin 1 ratio 2 ratio 4,rcc ab pl,plaster 18mm cs,vitrified 800 by800by10,skirting 800by20by10,sl paver block 80 mm,pvc exhaust fan 12 inch,wc europian,autoflush urinal,wash basin 630by450mm,mirror 6mm polished,toilet paper holder,bib cock 20nb,stop cock 20nb,mixer bib cock 20nb,cp brass shower,upvc waste pip 100nb,cp brass hook,venettian blind hoz,sfe str steel sa 2.5,galvalume sheet,excv less than 1.5 ord dis in,steel reinforcement,toughened glass 12mm,upvc door frame,pvc door shutter 35,louver glass anodize,plumbing items,electrical items
Waterproof 7 course,bld pnt exterior,dismantl pcc,dismantl rcc,dismantl brick mason,dismantl plaster,dismantl door window,brk msn ab pl cs c40,pcc plin 1 ratio 2 ratio 4,rcc ab pl,plaster 18mm cs,vitrified 800 by800by10,skirting 800by20by10,sl paver block 80 mm,pvc exhaust fan 12 inch,wc europian,autoflush urinal,wash basin 630by450mm,mirror 6mm polished,toilet paper holder,bib cock 20nb,stop cock 20nb,mixer bib cock 20nb,cp brass shower,upvc waste pip 100nb,cp brass hook,venettian blind hoz,sfe str steel sa 2.5,galvalume sheet,excv less than 1.5 ord dis in,steel reinforcement,toughened glass 12mm,upvc door frame,pvc door shutter 35,louver glass anodize,plumbing items,electrical items
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstraction of pcc road form hamjapur the field towards choyghariyapara icds center pcc at hamjapur sansad
Constraction of pcc road form hamjapur the field towards choyghariyapara icds center pcc at hamjapur sansad
Read moreConstruction of pcc road from bagti gram than to icds
Construction of pcc road from bagti gram than to icds
Read morePcc road form thakur than to natun bandh at mudih bandwan(23-24)
Pcc road form thakur than to natun bandh at mudih bandwan(23-24)
Read moreof your Industry type