Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fresh Electrical Wiring At Project Office Of Aadocm, Dhori Area
|
| Description |
Fresh Electrical Wiring At Project Office Of Aadocm, Dhori Area
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_317004_4 |
|
Reference Number |
GM(D)/SO(EnM)/DA/2024-25/32 |
| Tender Fee | 0 |
| EMD | 13200 |
| Tender Value | - |
| Place | AADOCM, Dhori Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=328522 |
| Start Date | September 10, 2024 15:30 |
| End Date |
Expired
21/09/2024
Expired 733 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreRenovation of project office of aadocm project of dhori area.
Renovation of project office of aadocm project of dhori area.
Read moreRe-wiring/fresh wiring at g.m. bunglow, dhori under g.m. unit, dhori area
Re-wiring/fresh wiring at g.m. bunglow, dhori under g.m. unit, dhori area
Read moreRepairing work of dumpers in aadocm project of dhori area
Following repairing work in aadocm project of dhori area (i) repairing of p.t.o. assembly of bh60m dumper sl no d-60055 and d-60064. (ii) repairing and fitting of pan hard rod (one end) mounting of dumper sl no d-60396, d-10358 and d-60042
Read moreCleaning of drain at staff quarter colony under aadocm project of dhori area.
Cleaning of drain at staff quarter colony under aadocm project of dhori area.
Read moreInstallation and commissioning of etp at aadocm excavation workshop of aadocm, dhori area.
Installation and commissioning of etp at aadocm excavation workshop of aadocm, dhori area.
Read moreRepair and maintenance of old dispensary at staff colony under aadocm project, dhori area
Repair and maintenance of old dispensary at staff colony under aadocm project, dhori area
Read moreRepair of feeder breakers installed at aadocm, dhori area
Repair of feeder breakers installed at aadocm, dhori area
Read moreof your Industry type