Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing Of New Change Of Worm Wheel, Worm Shaft And Worm Wheel Shaft Etc. For U1000 Gear Box,(Make Premium (Sl.No. 150211) And Radicon (Sl.No. Cws/02 And Cws/03), Qty 03 (Three) Nos. Of Moonidih Workshop, Wj Area
|
Description |
Repairing Of New Change Of 
Worm Wheel, Worm Shaft And 
Worm Wheel Shaft Etc. For U1000 Gear Box,(Make Premium (Sl.No. 150211) And 
Radicon (Sl.No. Cws/02 And 
Cws/03), Qty 03 (Three) Nos. 
Of Moonidih Workshop, Wj 
Area
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_304697_1 |
Reference Number |
BCCL/WJA/AM(ENM)/23-24/RP-192 |
Tender Fee | 0 |
EMD | 4653 |
Tender Value | |
Place | Moonidih Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=315665 |
Start Date | March 12, 2024 15:30 |
End Date |
19/03/2024 ( Expired 469 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing and fitting of (02 nos.) trolley wheel, shaft and line repairing of unit no. 930 and 932 in rlb section of kathara washery
Repairing and fitting of (02 nos.) trolley wheel, shaft and line repairing of unit no. 930 and 932 in rlb section of kathara washery
Read moreRepairing of 06 nos. radicon make gear box u-600 at kurja ug mine of kurja sub area.
Repairing of 06 nos. radicon make gear box u-600 at kurja ug mine of kurja sub area.
Read more(a)complete repairing and overhauling of (02 nos.) magnetic separator drum assembly of unit no. 220 and 222 and (b)repairing and overhauling of (03 nos.) motorized gear box of unit no. 218, 220 and 222 in hms section of kathara washery
(a)complete repairing and overhauling of (02 nos.) magnetic separator drum assembly of unit no. 220 and 222 and (b)repairing and overhauling of (03 nos.) motorized gear box of unit no. 218, 220 and 222 in hms section of kathara washery
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreRepairing and overhauling of by pass b/c gear box radicon make u 800, reversible and a side shuttle conveyor make radicon u 600 and rom b/c premium make cbhz 320 in pch section at sawang washery.
Repairing and overhauling of by pass b/c gear box radicon make u-800, reversible and a side shuttle conveyor make radicon u-600 and rom b/c premium make cbhz-320 in pch section at sawang washery.
Read moreRepairing of both side bull gear and pinion of propel shaft by welding and grinding , opening and fitment of propel gear box,material maching and grooming of both side propel shaft splines by welding and grinding , 19 n0s damaged tooth point of bull
Repairing of both side bull gear and pinion of propel shaft by welding and grinding , opening and fitment of propel gear box,material maching and grooming of both side propel shaft splines by welding and grinding , 19 nos damaged tooth point of bull
Read moreRepairing and maintenance of different unit assembly of 02 nos. trucks having reg. no. jh02bg-7762 n jh02bg-4295 like gear box, body work, steering boxes, filters, and greasing works, etc. make tata motors under magadh ocp, m-s area
Repairing and maintenance of different unit assembly of 02 nos. trucks having reg. no. jh02bg-7762 n jh02bg-4295 like gear box, body work, steering boxes, filters, and greasing works, etc. make tata motors under magadh ocp, m-s area
Read moreRepairing and reconditioning of 02 nos joint box of 180 kw and 370 kw ht motors, 02 nos 3.3kw er and foundation system of 3 phase alstom and marathon make a/c induction motor of karma project under kuju area.
Repairing and reconditioning of 02 nos joint box of 180 kw and 370 kw ht motors, 02 nos 3.3kw er and foundation system of 3 phase alstom and marathon make a/c induction motor of karma project under kuju area.
Read moreRepairing and overhauling of by pass b/c gear box radicon make u 800, reversible and a side shuttle conveyor make radicon u 600 and rom b/c premium make cbhz 320 in pch section at sawang washery.
Repairing and overhauling of by pass b/c gear box radicon make u 800, reversible and a side shuttle conveyor make radicon u 600 and rom b/c premium make cbhz 320 in pch section at sawang washery.
Read moreRepairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Read moreof your Industry type