Tender Details
Particulars | Details |
---|---|
Title |
Supply And Stacking Of Crushed Stone Chips Of Size 22.40 Mm, Stone Chips 11.20 Mm, Stone Chips 6.70 Mm And Crushed Stone Dust At Km 09.00 (Hmp Site) On Balipara Charduar Tawang Road In The State Of Assam
|
Description |
Supply And Stacking Of Crushed Stone Chips Of Size 22.40 Mm, Stone Chips 11.20 Mm, Stone Chips 6.70 Mm And Crushed Stone Dust At Km 09.00 (Hmp Site) On Balipara Charduar Tawang Road In The State Of Assam
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2025_BRO_696816_1 |
Reference Number |
CDR 14TF/NIT-04/2024-25 |
Tender Fee | 0 |
EMD | 2.39 Lakh |
Tender Value | |
Place | KM 09.00 (HMP SITE) ON BALIPARA-CHARDUAR-TAWANG RO |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=780262 |
Start Date | February 22, 2025 18:30 |
End Date |
04/03/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreSupply and stacking of crushed stone aggregates of various size and coarse sand for gsb works from km 7.00 to km 20.00 and for pmt works between km 14.00 to km 20.00 on road toong-partem pt- 4685 road under 107 rcc/758 brtf in project swastik in the
Supply and stacking of crushed stone aggregates of various size and coarse sand for gsb works from km 7.00 to km 20.00 and for pmt works between km 14.00 to km 20.00 on road toong-partem pt- 4685 road under 107 rcc/758 brtf in project swastik in the
Read moreDesign, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road
Design, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road
Read moreSupply and stacking of materials stone aggs 13.20 mm at km 36.00 hmp site tanda for resurf on road
Read more
Supply and stacking of stone boulders, stone metal 63 mm, 45 mm, 40 mm, 26.5 mm, stone chips 20 mm, 13.2 mm, 10 mm, 6.7 mm and sand for permanent and surfacing work as per morth specns for bp-157 for construction of approach roads along imb
Supply and stacking of stone boulders, stone metal 63 mm, 45 mm, 40 mm, 26.5 mm, stone chips 20 mm, 13.2 mm, 10 mm, 6.7 mm and sand for permanent and surfacing work as per morth specns for bp-157 for construction of approach roads along imb
Read moreSupply and stacking of stone boulders, stone metal 63 mm, 45 mm, 40 mm, 26.5 mm, stone chips 20 mm, 13.2 mm, 10 mm, 6.7 mm and sand for permanent and surfacing work as per morth specns for bp-156 for construction of approach roads along indo-mayanmar
Supply and stacking of stone boulders, stone metal 63 mm, 45 mm, 40 mm, 26.5 mm, stone chips 20 mm, 13.2 mm, 10 mm, 6.7 mm and sand for permanent and surfacing work as per morth specns for bp-156 for construction of approach roads along imb
Read moreSupply and stacking of stone chips 20 mm for substructure work at km 35.25 on mpd road,supply and s
Read more
of your Industry type