Tender Details
Particulars | Details |
---|---|
Title |
De And End Shield For 55 Kw 3 Phase Squirrel Cage Induction Motor
|
Description |
|
Organisation | Department of Atomic Energy | PMO |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 23, 2025 19:18 |
End Date |
14/05/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreHiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Read moreProcurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreSupply of trinocular phase contrast microscope with camera for pathology and lab medicine
Supply of trinocular phase contrast microscope with camera for pathology and lab medicine
Read moreProviding security services at various location and housekeeping staff at metro bhawan on outsource basis for period of 3 years for nagpur metro rail project
Providing security services at various location and housekeeping staff at metro bhawan on outsource basis for period of 3 years for nagpur metro rail project
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreMaintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Maintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Read moreof your Industry type