Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Labour Charges For Conversion Of Overhead Lines To Under Ground Cable Service Connection Conversion Works At Various Locations In Kodungaiyur (Venkateswara Colony) Of Perambur Division
|
Description |
Labour Charges For Conversion Of Overhead Lines To Under Ground Cable Service Connection Conversion Works At Various Locations In Kodungaiyur (Venkateswara Colony) Of Perambur Division
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_354824_1 |
Reference Number |
OT-54/2023-24 |
Tender Fee | 0 |
EMD | 25000 |
Tender Value | |
Place | office of Superintending Engineer CEDC North |
Link | https://tntenders.gov.in |
Start Date | August 04, 2023 23:30 |
End Date |
18/08/2023 ( Expired 684 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreSelection of roof top developer for setting up grid connected solar roof top plants at various locations on government buildings in the state of manipur on resco mode through tariff-based competitive bidding
Selection of roof top developer for setting up grid connected solar roof top plants at various locations on government buildings in the state of manipur on resco mode through tariff-based competitive bidding
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreWork service for repair/resurfacing of certain road including road furniture and allied works in zone a under ge af tech area at afs agra
Work service for repair/resurfacing of certain road including road furniture and allied works in zone a under ge af tech area at afs agra
Read moreAdd/alnt of old ug ht cable and spl repair including upgradation of 11 kv oh lines in ht ug cable with allied works in sukna mil stn under ge sukna
Add/alnt of old ug ht cable and spl repair including upgradation of 11 kv oh lines in ht ug cable with allied works in sukna mil stn under ge sukna
Read moreSpl repair to roads in various locations of thakurbari mil stn under ge(n) tezpur
Spl repair to roads in various locations of thakurbari mil stn under ge(n) tezpur
Read moreof your Industry type