Tender Details
Particulars | Details |
---|---|
Title |
Ar Mo Supplementary Drain
|
Description |
Maintenance Of The Supplementary Drain By Removing Hyacinth All Kinds Of Floating Materials Water Growing Plants Patera Weeds Grass Islands And All Other Floating Waste Materials From Water Surface And Disposing Of Them At A Suitable Place Outside Th
|
Organisation | Irrigation and Flood Control | State Govt. and UT |
Tender Id | 2025_IFC_269928_1 |
Reference Number |
EE/CD-XI/NIT-10/2024-25/2nd Call |
Tender Fee | 0 |
EMD | 39087 |
Tender Value | |
Place | DELHI |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=354256 |
Start Date | March 22, 2025 17:00 |
End Date |
26/03/2025 ( Expired 66 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rcc draintotal 8.06 km of nh-512 nh division vii
Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569
Read moreConstruction of c c drain at-uike house to open plot , pr no-09 deshmukh house to uike house nagar parishad akot tq-akot dist-akola
Construction of c c drain at-uike house to open plot , pr no-09 deshmukh house to uike house nagar parishad akot tq-akot dist-akola
Read moreOverhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreSitc of bed cum passenger lift at ipd building_ opd building_ 2 nos mo quarter and 2 nos nurse quarter buildings
Construction of infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds at kaliyaganj in the district of uttar dinajpur - sitc of bed cum passenger lift at ipd building, opd building-2nos mo quarter and 2nos quarter
Read moreRoller repair and overhauling work on gates of shahdara drain and hindon cut canal regulator new delhi.
Roller repair and overhauling work on gates of shahdara drain and hindon cut canal regulator new delhi.&#x0d
Read moreReplacement of new main rollers on gates of shahdara drain and hindon cut canal regulator new delhi
Replacement of new main rollers on gates of shahdara drain and hindon cut canal regulator new delhi&#x0d
Read moreReplacement of new side rollers on gates of shahdara drain and hindon cut canal regulator new delhi
Replacement of new side rollers on gates of shahdara drain and hindon cut canal regulator new delhi
Read moreConstruction of rcc drain at different places in ward no 06
Construction of rcc drain at different places in ward no 06
Read moreof your Industry type