Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Coal Receiving Plate Of Mainframe Hopper Between Unloading Point To Conveyor Chain Carriage Plate Of Bwf Make Feeder Breaker Installed At Tarmi Siding In R/O Sdocm Project
|
Description |
Repairing Of Coal Receiving Plate Of Mainframe Hopper Between Unloading Point To Conveyor Chain Carriage Plate Of Bwf Make Feeder Breaker Installed At Tarmi Siding In R/O Sdocm Project
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_333097_1 |
Reference Number |
SDOCM/PE(EnM)/e.NIT/24-25/35 dt.21.03.2025 |
Tender Fee | 0 |
EMD | 3800 |
Tender Value | |
Place | SDOCM |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345301 |
Start Date | March 21, 2025 22:30 |
End Date |
31/03/2025 ( Expired 21 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of secondary crusher chute and build up teeth of secondary roller 2nos of black diamond make feeder breaker no.6 in r o aadocm , dhori area.
Repairing of secondary crusher chute and build up teeth of secondary roller 2nos of black diamond make feeder breaker no.6 in ro aadocm , dhori area.
Read moreRepairing of coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of bwf make feeder breaker installed at tarmi siding in r/o sdocm project
Repairing of coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of bwf make feeder breaker installed at tarmi siding in r/o sdocm project
Read moreRepairing work of platform and joist structure of digital (50t) make road weighbridge (local sl no. 1606) installed at karipani in r/o sdocm project
Repairing work of platform and joist structure of digital (50t) make road weighbridge (local sl no. 1606) installed at karipani in r/o sdocm project
Read moreRepairing of coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of bwf make feeder breaker installed at tarmi siding in r/o sdocm project
Repairing of coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of bwf make feeder breaker installed at tarmi siding in r/o sdocm project
Read moreStrengthening of base-frame, realignment of crusher roller motor (160kw) with gearbox, repairing of shear hub and plumber block of atlas copco make feeder breaker (local sl no. 02) installed at tarmi siding under sdocm project.
Strengthening of base-frame, realignment of crusher roller
 motor (160kw) with gearbox, repairing of shear hub and plumber block of atlas copco make feeder breaker (local sl no. 02) installed at tarmi siding under sdocm project.
Read moreProcurement of spares for elecon make feeder breaker chain conveyor helical gear box kdh 500 450 r-112:1 working at kistaram oc, kothagudem area on proprietary basis
Procurement of spares for elecon make feeder breaker chain conveyor helical gear box kdh 500 450 r-112:1 working at kistaram oc, kothagudem area on proprietary basis
Read moreRe-wiring/repairing of wiring at 5 nos. weigh bridge (as kps, s.k. unit, tarmi, railway siding, makoli) and sub-station room in r/o sdocm of dhori area.
Re-wiring/repairing of wiring at 5 nos. weigh bridge (as kps,
 s.k. unit, tarmi, railway siding, makoli) and sub-station room in r/o sdocm of dhori area.
Read moreRepairing of top and bottom mother plate, side hopper plate, moving plate, coal receiving plate of hopper for b.w.f make feeder breaker (local sl no. 05) installed at tarmi siding in r/o sdocm project.
Repairing of top and bottom mother plate, side hopper plate, moving plate, coal receiving plate of hopper for b.w.f make feeder breaker (local sl no. 05) installed at tarmi siding in r/o sdocm project.
Read moreRepairing/changing of base mounted gear box and motor to wall mounted to drive primary crusher roller and repairing of secondary crusher roller drive system and its related coal flow mother plate of bwf make feeder braker no-05 installed at tarmi si
Repairing/changing of base mounted gear box and motor to wall mounted to drive primary crusher roller and repairing of secondary crusher roller drive system and its related coal flow mother plate of bwf make feeder braker no-05 installed at tarmi sid
Read moreDamage bunker plate joist dismantling and new joist plate fitting welding and repairing at atlas copco make feeder breaker of bnr siding rocp/sj.
Damage bunker plate joist dismantling and new joist plate fitting welding and repairing at atlas copco make feeder breaker of bnr siding rocp/sj.
Read moreof your Industry type