Tender Details
About Tender
🚇 Invitation For Bids: Elevated Viaduct Construction For Bhubaneswar Metro Phase I 🛠️🏗️ The Delhi Metro Rail Corporation Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids From Experienced Contractors For The Part Design And Construction Of An Elevated Viaduct And Six Elevated Structures For The Bhubaneswar Metro Phase I Mrts, From Chainage 625.00 M To 7747.00 M. 📅 Bid Submission Deadline: May 8, 2024, 3:00 Pm Tender Fee: Inr 23,600 Earnest Money Deposit (Emd): Inr 10 Million This Project Excludes Architectural Finishing And Requires A Detailed Proposal That Addresses The Design, Construction Methodology, And Timelines, In Compliance With The Specifications Outlined In The Tender Documents. Keywords: Elevated Viaduct, Construction, Bhubaneswar Metro Phase I, Delhi Metro Rail Corporation Limited, Metro Rail, Tender, Bid, Infrastructure ProjectParticulars | Details |
---|---|
Title |
Part Design And Construction Of Elevated Viaduct And Six Elevated (Excluding Architectural Finishing ) From Chainage 625.00 M To 7747.00 M Of Bhubaneswar Metro Phase I Mrts.
|
Description |
Part Design And Construction Of Elevated Viaduct And Six Elevated (Excluding Architectural Finishing ) From Chainage 625.00 M To 7747.00 M Of Bhubaneswar Metro Phase I Mrts.
|
Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
Tender Id | 2024_DMRC_799859_1 |
Reference Number |
BBC-03 |
Tender Fee | 23600 |
EMD | 1 Crore |
Tender Value | |
Place | Bhubaneswar |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840775 |
Start Date | May 31, 2024 14:30 |
End Date |
18/06/2024 ( Expired 326 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreRehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreDesign, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read morePerformance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota
Performance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota
Read moreS i t c of new ei system for sandt arrangement to the existing stpp private railway siding including connected infrastructure (for phase i lines of stpp siding and ltc siding from mancherial to srp chp, jaipur vand m, mancherial, ts.
S i t c of new ei system for sandt arrangement to the existing stpp private railway siding including connected infrastructure (for phase i lines of stpp siding and ltc siding from mancherial to srp chp, jaipur vand m, mancherial, ts.
Read moreof your Industry type