Tender Details
About Tender
🚇 Invitation For Bids: Elevated Viaduct Construction For Bhubaneswar Metro Phase I 🛠️🏗️ The Delhi Metro Rail Corporation Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids From Experienced Contractors For The Part Design And Construction Of An Elevated Viaduct And Six Elevated Structures For The Bhubaneswar Metro Phase I Mrts, From Chainage 625.00 M To 7747.00 M. 📅 Bid Submission Deadline: May 8, 2024, 3:00 Pm Tender Fee: Inr 23,600 Earnest Money Deposit (Emd): Inr 10 Million This Project Excludes Architectural Finishing And Requires A Detailed Proposal That Addresses The Design, Construction Methodology, And Timelines, In Compliance With The Specifications Outlined In The Tender Documents. Keywords: Elevated Viaduct, Construction, Bhubaneswar Metro Phase I, Delhi Metro Rail Corporation Limited, Metro Rail, Tender, Bid, Infrastructure ProjectParticulars | Details |
---|---|
Title |
Part Design And Construction Of Elevated Viaduct And Six Elevated (Excluding Architectural Finishing ) From Chainage 625.00 M To 7747.00 M Of Bhubaneswar Metro Phase I Mrts.
|
Description |
Part Design And Construction Of Elevated Viaduct And Six Elevated (Excluding Architectural Finishing ) From Chainage 625.00 M To 7747.00 M Of Bhubaneswar Metro Phase I Mrts.
|
Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
Tender Id | 2024_DMRC_799859_1 |
Reference Number |
BBC-03 |
Tender Fee | 23600 |
EMD | 1 Crore |
Tender Value | |
Place | Bhubaneswar |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840775 |
Start Date | May 31, 2024 14:30 |
End Date |
18/06/2024 ( Expired 349 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read morePerformance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Read moreConsultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat
Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreChief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreof your Industry type