Tender Details
Particulars | Details |
---|---|
Title |
Dismantling Of Worn Out Shipper Shaft Assembly And Assembling/Fitting The Same With Repaired Assembly Of Be 5 (Exc 2476) Rope Shovel, Working At Bina Project.
|
Description |
Dismantling Of Worn Out Shipper Shaft Assembly And Assembling/Fitting The Same With Repaired Assembly Of Be 5 (Exc 2476) Rope Shovel, Working At Bina Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_NCL_317114_1 |
Reference Number |
Bina/SO(Excv)/Tender/24-25/49 dt 09.09.2024 |
Tender Fee | 0 |
EMD | 2600 |
Tender Value | |
Place | Bina Project, NCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=328651 |
Start Date | September 10, 2024 14:30 |
End Date |
20/09/2024 ( Expired 258 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Read moreTtps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Read moreReplacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreRepairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Read moreComplete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Read moreRepairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Read moreRepairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.
Repairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.
Read moreRepairing / re-conditioning of damaged / worn-out teeth of 02 nos. 3rd intermediate pinion shaft and 2 nos. tumbler gear of propel gear box system for be-195 shovel working at bina project.
Repairing / re-conditioning of damaged / worn-out teeth of 02 nos. 3rd intermediate pinion shaft and 2 nos. tumbler gear of propel gear box system for be-195 shovel working at bina project.
Read moreRepairing of travel reducer gear box output shaft, bearing damaged bearing taking out housing and new bearing press fitting and assembling of gear box of ekg shovel hmb 543/s-383 of kuya ocpbastacolla area-ix.
Repairing of travel reducer gear box output shaft,
 bearing damaged bearing taking out housing and new bearing press fitting and assembling of gear box of ekg shovel hmb 543/s-383 of kuya ocpbastacolla area-ix.
Read moreReplacement of sliding pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum unit 502 and 704 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of sliding pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum unit 502 and 704 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreof your Industry type