Tender Details

Particulars Details
Title
Delhi Village Development Board Works Under Idruv In N.C.T. Of Delhi.
Description
Construction Of Road Alongwith Side Drains Of Mata Wali Gali And&Amp#X0d Side Gallies In Village Bakhtawarpur In Narela Ac 01 In Distt.&Amp#X0d North.
Organisation Irrigation and Flood Control | State Govt. and UT
Tender Id 2024_IFC_262795_1
Reference
Number
EE/CD-VI/ACS-41/2024-25
Tender Fee 0
EMD 2.4 Lakh
Tender Value
Place DELHI
Link
View Original Tender Notice

https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344410

Start Date September 26, 2024 14:30
End Date
Expired 01/10/2024

Expired 658 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works

Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works

Read more
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.

Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.

Read more
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc

Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh

Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise