Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Delhi Village Development Board Works Under Idruv In N.C.T. Of Delhi.
|
| Description |
Construction Of Road Alongwith Side Drains Of Mata Wali Gali And&Amp#X0d
Side Gallies In Village Bakhtawarpur In Narela Ac 01 In Distt.&Amp#X0d
North.
|
| Organisation | Irrigation and Flood Control | State Govt. and UT |
| Tender Id | 2024_IFC_262795_1 |
|
Reference Number |
EE/CD-VI/ACS-41/2024-25 |
| Tender Fee | 0 |
| EMD | 2.4 Lakh |
| Tender Value | |
| Place | DELHI |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344410 |
| Start Date | September 26, 2024 14:30 |
| End Date |
Expired
01/10/2024
Expired 658 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreWork of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreAnnual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreMaintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based
 maintenance contract in the state of uttar pradesh.
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreof your Industry type