Tender Details

Particulars Details
Title
General Budget Work 2024 25 20 Percentage Upgradation With Bm And Bc Improvements To Erumakkulam Thanniyadi Road Between Km 1 200 To 2 600 General Civil Work
Description
General Budget Work 2024 25 20 Percentage&Amp#X0d Upgradation With Bm And Bc Improvements To&Amp#X0d Erumakkulam Thanniyadi Road Between Km&Amp#X0d 1 200 To 2 600 General Civil Work
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_712407_1
Reference
Number
PWD/RB/TR/106592/2021_5_1_1/1
Tender Fee 8270
EMD 1 Lakh
Tender Value
Place kasaragod
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1121111
Start Date December 04, 2024 21:30
End Date

17/12/2024 ( Expired 149 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)

R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1

Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1

Read more
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road

Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise