Tender Details
Particulars | Details |
---|---|
Title |
Carrying Out Continuous 24 Hrs Videographic Traffic And Transaction Survey Using Video Camera For 7 Days At Rajiv Gandhi Sea Link
|
Description |
Carrying Out Continuous 24 Hrs Videographic Traffic And Transaction Survey Using Video Camera For 7 Days At Rajiv Gandhi Sea Link
|
Organisation | Maharashtra State Road Development Corporation | State Govt. and UT |
Tender Id | 2024_MSRDC_1123941_1 |
Reference Number |
T 2849 |
Tender Fee | 6400 |
EMD | 10000 |
Tender Value | |
Place | Mumbai |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1961735 |
Start Date | December 13, 2024 21:00 |
End Date |
21/12/2024 ( Expired 122 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing installation, operation and maintenance of 1500 kva dg set on hire basis round the clock(24 x 7 days) for emergency supply at delhi state cancer institute (east) dilshad garden, delhi
Providing installation, operation and maintenance of 1500 kva dg set on hire basis round the clock(24 x 7 days) for emergency supply at delhi state cancer institute (east) dilshad garden, delhi
Read morePreparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Preparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Read moreConst of jawan living accommodation with toilet bathroom at bagte area camp of 10 bn itbp ki(sh carrying out digital survey and soil investigation for detail architectural and engineering design for construction of various building)
Const of jawan living accommodation with toilet bathroom at bagte area camp of 10 bn itbp ki(sh carrying out digital survey and soil investigation for detail architectural and engineering design for construction of various building)
Read moreCarrying out classified traffic volume count for 3 continuous days using mobile automatic traffic and classifier (atcc) survey supported by videography for peak period and toll tax collection levy per annum on bandhgachha to fatepur road
Carrying out classified traffic volume count for 3 continuous days using mobile automatic traffic and classifier (atcc) survey supported by videography for peak period and toll tax collection levy per annum on bandhgachha to fatepur road
Read moreProviding installation, operation and maintenance of 1500 kva dg set on hire basis round the clock (24 x 7 days) for emergency supply at delhi state cancer institute(east) dilshad garden, delhi
Providing installation, operation and maintenance of 1500 kva dg set on hire basis round the clock (24 x 7 days) for emergency supply at delhi state cancer institute (east) dilshad garden, delhi
Read moreCarrying out classified traffic volume count ctvc for 3 continuous days using mobile automatic traffic and classifier survey supported by videography for peak period and toll tax collection levy per annum
Carrying out classified traffic volume count ctvc for 3 continuous days using mobile automatic traffic and classifier survey supported by videography for peak period and toll tax collection levy per annum
Read moreRegarding carrying out necessary maintenance work in rajiv gandhi rotary / island and surrounding green belt areas under 7 star ward no. 74zone no. 13under swachhta survey 2024-2025.
Regarding carrying out necessary maintenance work in rajiv gandhi rotary / island and surrounding green belt areas under 7 star ward no. 74zone no. 13under swachhta survey 2024-2025.
Read moreComprehensive maintenance and repairs of rajiv gandhi bandra worli sea link worli mumbai for three years
Comprehensive maintenance and repairs of rajiv gandhi bandra worli sea link worli mumbai for three years
Read moreCarrying out survey, preparation of dpr using innovative techniques and methods for restoration of canal irrigation capacity of dy and water course of kadwa right bank canal (krbc).
Carrying out survey, preparation of dpr using innovative techniques and methods for restoration of canal irrigation capacity of dy and water course of kadwa right bank canal (krbc).
Read moreNctps i es circle em ii dn s dn iv sm cable section carrying out maintenance works and all types of cable related works in cable section for a period of 360 days at nctps i
Nctps i es circle em ii dn s dn iv sm cable section carrying out maintenance works and all types of cable related works in cable section for a period of 360 days at nctps i
Read moreof your Industry type