Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Check Dam Near Baniyadih Shamsaan Ghat In Kowa River Under Block Thakurgangti, District Godda
|
Description |
Construction Of Check Dam Near Baniyadih Shamsaan Ghat In Kowa River Under Block Thakurgangti, District Godda
|
Organisation | WRD EinC Major-Med n Minor | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 2.06 Lakh |
Tender Value | |
Place | Block - Thakurgangti, Dist - Godda |
Link |
AAAAAAAAAA Login to view |
Start Date | June 28, 2025 16:00 |
End Date |
14/07/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreReconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreWidening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham
Widening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham
Read moreWidening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Read moreof your Industry type