Tender Details
Particulars | Details |
---|---|
Title |
Charges For Routine Cleaning Of Fly Ash And Coal Dust From The Cable Trays And Cable Ducts In And Around Boiler Area And Mill Area Etc And Routine Cleaning And Minor Maintenance Work Of Boiler Side Fan Motors Mill Motors Lub Oil Motors Feeder Motor
|
Description |
Charges For Routine Cleaning Of Fly Ash And Coal Dust From The Cable Trays And Cable Ducts In And Around Boiler Area And Mill Area Etc And Routine Cleaning And Minor Maintenance Work Of Boiler Side Fan Motors Mill Motors Lub Oil Motors Feeder Motor
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_522802_1 |
Reference Number |
CE/SE/ES/TTPS/No.33/2025-26 |
Tender Fee | 0 |
EMD | 8500 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=622371 |
Start Date | February 05, 2025 14:30 |
End Date |
20/02/2025 ( Expired 60 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Biennial maintenance contract for cleaning and housekeeping of boiler coal mill area other adjacent area and round the clock operation and tit bit maintenance of mrs for unit 3 and unit 4 and upcoming unit 5
Biennial maintenance contract for cleaning and housekeeping of boiler coal mill area other adjacent area and round the clock operation and tit bit maintenance of mrs for unit 3 and unit 4 and upcoming unit 5
Read moreAnnual work contract for cleaning of accumulated fly ash dust around the silo of phi phii phiii silo area roadsopen space near silo by hiring the jcb machine with sel and operator loading into the trucksdispose off into ash sump at 4x210mw silo
Annual work contract for cleaning of accumulated fly ash dust around the silo of phi phii phiii silo area roadsopen space near silo by hiring the jcb machine with sel and operator loading into the trucksdispose off into ash sump at 4x210mw silo
Read moreComplete cleaning of ash, dust, oil, grease, waste materials, cobweb from different floors, walls, ceilings, walkways, structures, railings, staircase etc. of btps b plant buildings like chetna bhawan, ct switch room 1 and 2 and petrol pump area
Complete cleaning of ash, dust, oil, grease, waste materials, cobweb from different floors, walls, ceilings, walkways, structures, railings, staircase etc. of btps b plant buildings like chetna bhawan, ct switch room 1 and 2 and petrol pump area
Read moreNctps i cm circle cm ii routine maintenance cleaning collection of garbages sweeping clearing of litter and dry leaves ash deposits coal dust around the building and roads of esp ahp foph chimney and dm plant and inside of floor
Nctpsi cm circle cm ii routine maintenance cleaning collection of garbages sweeping clearing of litter and dry leaves ash deposits coal dust around the building and roads of esp ahp foph chimney and dm plant and inside of floor
Read moreTtps mech ii bm unit ii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit ii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit i cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit i cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreManual cleaning, collection and removal of mill rejects, ash, clinkers, other coal spillage in the basement areas, coal feeder areas, boiler furnace areas, silo area and other areas of unit no.7 and 8 of dpps for a period of 02(two) years.
Manual cleaning, collection and removal of mill rejects, ash, clinkers, other coal spillage in the basement areas, coal feeder areas, boiler furnace areas, silo area and other areas of unit no.7 and 8 of dpps for a period of 02(two) years.
Read moreWork contract for routine maintenance of 12 nos. 8.5 e 9 abb/abl coal mill and its auxiliaries, repair of coal pipes,draining, collection and transportation of mill reject/coal dust/ rcf ped raw coal etc. of unit no. 1 and 2 of ph-i at sgtps
Work contract for routine maintenance of 12 nos. 8.5 e 9 abb/abl coal mill and its auxiliaries, repair of coal pipes,draining, collection and transportation of mill reject/coal dust/ rcf ped raw coal etc. of unit no. 1 and 2 of ph-i at sgtps
Read moreCleaning of firing floor area, cable trays, lub oil and t.g equipments 2024
Cleaning of firing floor area, cable trays, lub oil and t.g equipments 2024.
Read moreof your Industry type