Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Demolishing Of Damaged Concrete Rcc Base, Dismantling Of M.S Foundation Frame And Casting Of New Concrete Rcc Base With Fabrication Of New M.S Foundation Frame For Pump Motor No 3 Of Phase Ii Along With Anticorrosive Painting Of All Foundation Frame
|
| Description |
Demolishing Of Damaged Concrete Rcc Base, Dismantling Of M.S Foundation Frame And Casting Of New Concrete Rcc Base With Fabrication Of New M.S Foundation Frame For Pump Motor No 3 Of Phase Ii Along With Anticorrosive Painting Of All Foundation Frame
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_MCL_342948_1 |
|
Reference Number |
GM/LA/SO/EnM/e-Ten/25-26/31 DT-01.09.25 |
| Tender Fee | 0 |
| EMD | 3100 |
| Tender Value | - |
| Place | IWSS LINGARAJ, AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355568 |
| Start Date | September 03, 2025 15:30 |
| End Date |
Expired
15/09/2025
Expired 397 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Matching of 1 no. motor pump set with base frame fabrication, followed by supplying and fixing a tyre coupling set r-140, base frame foot bolts, fabrication fitting of suction and delivery rings, nipples, to ready for stand by used for colony and min
Matching of 1 no. motor pump set with base frame fabrication, followed by supplying and fixing a tyre coupling set r-140, base frame foot bolts, fabrication fitting of suction and delivery rings, nipples, to ready for stand by used for colony and min
Read moreTtps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreFabrication and erection along with rcc foundation of vertical stacking racks for stacking of diesel/electrical locomotives overhauled spares at dls/vskp contract period - one year).
Fabrication and erection along with rcc foundation of vertical stacking racks for stacking of diesel/electrical locomotives overhauled spares at dls/vskp contract period - one year).
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreRepairing of 04 nos. 3300 v vcb field switches and vcb dol starters of makes electroteknica, a. yule, and mineline, including fabrication of base frames, welding, cutting, gate and roof repair, and dismantling and refitting of 3300 v vcbs at potanga
Repairing of 04 nos. 3300 v vcb field switches and vcb dol starters of makes electroteknica, a. yule, and mineline, including fabrication of base frames, welding, cutting, gate and roof repair, and dismantling and refitting of 3300 v vcbs at potanga
Read moreSite preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type