Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Demolishing Of Damaged Concrete Rcc Base, Dismantling Of M.S Foundation Frame And Casting Of New Concrete Rcc Base With Fabrication Of New M.S Foundation Frame For Pump Motor No 3 Of Phase Ii Along With Anticorrosive Painting Of All Foundation Frame
|
| Description |
Demolishing Of Damaged Concrete Rcc Base, Dismantling Of M.S Foundation Frame And Casting Of New Concrete Rcc Base With Fabrication Of New M.S Foundation Frame For Pump Motor No 3 Of Phase Ii Along With Anticorrosive Painting Of All Foundation Frame
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_MCL_342948_1 |
|
Reference Number |
GM/LA/SO/EnM/e-Ten/25-26/31 DT-01.09.25 |
| Tender Fee | 0 |
| EMD | 3100 |
| Tender Value | - |
| Place | IWSS LINGARAJ, AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355568 |
| Start Date | September 03, 2025 15:30 |
| End Date |
Expired
15/09/2025
Expired 397 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreWater coolar stainless steel branded,04 kva stabiliser,coverd iron frame jall,cement foundation base,electrical assessaries cable socket etc,supply and instalation of low density polyethylene seamless one peace mouled tank and placing the same in proper positon including all taxes labour and tnp 500 ltr,complete submersible setup with all labour and material etc.,other labour charge and electrification,providing or fixing sign board photograph
Water coolar stainless steel branded,04 kva stabiliser,coverd iron frame jall,cement foundation base,electrical assessaries cable socket etc,supply and instalation of low density polyethylene seamless one peace mouled tank and placing the same in proper positon including all taxes labour and tnp 500 ltr,complete submersible setup with all labour and material etc.,other labour charge and electrification,providing or fixing sign board photograph
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreDemolishing cement concrete,demolishing rcc work,demolishing brick work,dismantling,taking out door
Read more
Dismantling and fabrication of foundation block, fabrication of new base frame for 5000 gph x 300 meter head existing pumping unit along with allied electro mechanical works at pumping station nagrota zairat base
Dismantling and fabrication of foundation block, fabrication of new base frame for 5000 gph x 300 meter head existing pumping unit along with allied electro mechanical works at pumping station nagrota zairat base
Read moreFabrication and supply of m.s. frame bathukammas
Fabrication and supply of m s frame bathukammas for natural flowers with 5ft height for the year 2025-26.
Read moreBjc for various natures of rcc dismantling, demolishing, cutting
Bjc for various natures of rcc dismantling, demolishing, cutting andstrengthening works under retrofitting work of concrete structures atinside plant area of ntpc vindhyachal.
Read moreof your Industry type