Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Division No. 16 (Approved Members) Involves Various Works Such As Mix Concrete, Asphalt Laying, Flooring, Drainage Line Repair, And Related Tasks.
|
| Description |
Division No. 16 (Approved Members) Involves Various Works Such As Mix Concrete, Asphalt Laying, Flooring, Drainage Line Repair, And Related Tasks.
|
| Organisation | Pune Municipal Corporation | State Govt. and UT |
| Tender Id | 2025_PMCP_1155357_1 |
|
Reference Number |
PMC/ROAD/2024/446 |
| Tender Fee | 6579 |
| EMD | 84208 |
| Tender Value | - |
| Place | KASBA PETH |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2009941 |
| Start Date | March 01, 2025 14:30 |
| End Date |
Expired
10/03/2025
Expired 584 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Facility management services - lumpsum based - commercial civil renovation involves modifying the permanent structure of a property such as wall demolition plumbing flooring and structural reinforcement all work material and laonour consumables to ..
Facility management services - lumpsum based - commercial civil renovation involves modifying the permanent structure of a property such as wall demolition plumbing flooring and structural reinforcement all work material and laonour consumables to ..
Read moreCivil work of floor 6 inches thick asphalt base with toe wall and drainage system,8 layers acrylic flooring for lawn tennis court, itf approved,fixed lawn tennis post with net complete,three seater iron bench,plastic chair
Civil work of floor 6 inches thick asphalt base with toe wall and drainage system,8 layers acrylic flooring for lawn tennis court, itf approved,fixed lawn tennis post with net complete,three seater iron bench,plastic chair
Read moreSite preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing
Site preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing
Read moreIn division no. 16 (approved members), various works such as remaining concrete work, laying of stormwater lines, installing paving blocks, repairing stormwater chambers, and other related tasks will be carried out.
In division no. 16 (approved members), various works such as remaining concrete work, laying of stormwater lines, installing paving blocks, repairing stormwater chambers, and other related tasks will be carried out.
Read moreAugmentation of existing yard office, providing cc flooring with concrete hardner topping on existing and new flooring of shed, augmentation of both new and old orh shed, extension of existing weather shed, providing rcc path way flooring, providing rolling shutter, ms tie bar fencing, epoxy flooring in store building, false ceiling, open drain with cover, under ground drainage pipe line network, water supply pipe line, water harvesting, under ground sumps and related incidental works as req
For complete deion and other details, please refer to tender
Read moreMas- division - 3rd and 4th line connectivity to road 1 & 2 at arakkonam yard - proposed construction of s&t building and cable hut consisting of foundation, rcc framed structure , finishing works such as brickwork, plastering, painting, flooring, carpentry,water supply, drainage arrangements and its allied works.
For complete deion and other details, please refer to tender
Read moreSpecial repair to sewage, drainage system and related works,provn of esd flooring of fss-iii store building,and provn of fire resistance false roofing in it server room, at 9 brd, provn of car parking shed at at afs pune under ge af lohegaon
Special repair to sewage, drainage system and related works,provn of esd flooring of fss-iii store building,and provn of fire resistance false roofing in it server room, at 9 brd, provn of car parking shed at at afs pune under ge af lohegaon
Read moreRepair to flooring of sick line 1& 2 at coach care centre & other allied works such as renovation of staff room , staff toilets ,bathroom c&w mini control room, repair to approach road to coach care center and drainage improvement of art pit & coach care center pit at delhi station in section of sse/w/dli/station under aden/dli.
For complete deion and other details, please refer to tender
Read moreof your Industry type