Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bifurcation Of Existing 33 Kv Kistareddypet Feeder
|
Description |
Bifurcation Of 33 Kv Kistareddypet Feeder Emanating From 132/33 Kv Patancheru Eht Ss With Erection Of 6.4 Km Of 33 Kv Scoh Interlinking Line (100 Sqmm.Aaac)on To 33 Kv Jinnaram Feeder Emanating From 132/33 Kv Gummadidala Eht Ss Over 11 Mtr Pscc And 12.5 Mtr Spun Poles Duly Tapping From 33/11 Kv Shivanagar Ss And Extending Up To
33/11 Kv Inole Ss Along With Providing The In And Out Arrangements In Both 33/11 Kv Shiva Nagar And 33/11 Kv Inole Ss In Patancheru Rural Section Of Patancheru Sub Division In Patancheru Division Of Sangareddy Circle Under T And D Improvements To Original Works (Reserved For Sc).
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 588905 |
Reference Number |
CE/OP/Medchal Zone -01/25-26 |
Tender Fee | 797 |
EMD | 44982 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | April 16, 2025 23:10 |
End Date |
24/04/2025 ( Expired 64 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Read moreIe services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreReconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Read moreModification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read moreRehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode
Rehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreConstruction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Construction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Read moreExpansion of existing fire and gas detection system at process plant, dahej plant ongc
Expansion of existing fire and gas detection system at process plant, dahej plant ongc
Read more33 kv double circuit un-galvanized steel lattice structure 42 feet long along with 3 nos. 33 kv cross arms (channel) and 48 nos. m. s. bolt with nuts complete package
33 kv double circuit un-galvanized steel lattice structure 42 feet long along with 3 nos. 33 kv cross arms (channel) and 48 nos. m. s. bolt with nuts complete package
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreof your Industry type