Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
💧 Procurement Opportunity: Amrut2 Water Treatment Plant Upgrade 🏭🚫 The Kerala Water Authority, A State Government Entity, Invites Bids For The Enhancement Of Production Capacity At The Pazhoor Water Treatment Plant (Wtp) To 100 Million Liters Per Day (Mld). The Project Includes The Modernization And Lifting Of Existing Vertical Turbine (Vt) Pump Sets. 📅 Bid Submission Deadline: May 15, 2024, 3:00 Pm Tender Fee: Inr 555 Emd: Inr 6090 Interested Bidders Should Possess The Necessary Technical Expertise And Experience In Similar High Capacity Water Treatment Projects. Proposals Must Include Detailed Technical Specifications, Pricing, And A Timeline For Project Completion. Keywords: Amrut2, Water Treatment Plant, Production Capacity, Wtp Upgrade, Kerala Water Authority, Vt Pump Sets, Government Tender, Bid Submission, Emd, Tender Fee| Particulars | Details |
|---|---|
| Title |
Amrut2 Improving Production Capacity Of 100 Mld Wtp Lifting Of Existing 2 Nos V Tpump Sets
|
| Description |
Amrut2 Improving Production Capacity Of 100 Mld Wtp Lifting Of Existing 2 Nos V Tpump Sets
|
| Organisation | Kerala Water Authority | State Govt. and UT |
| Tender Id | 2024_KWA_672409_1 |
|
Reference Number |
WRD/KWA-CE(CR)/TR/8842/2024 |
| Tender Fee | 555 |
| EMD | 6090 |
| Tender Value | - |
| Place | Pazhoor |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1046056 |
| Start Date | May 07, 2024 20:00 |
| End Date |
Expired
15/05/2024
Expired 881 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreAmrut-2.0 swap -3 -vaikom municipality-source improvement at 45 mld wtp-improving water supply by source improvements at existing water treatment plant and capacity enhancement of 45 mld wtp at mevelloor. -general civil work
Amrut-2.0 swap -3-vaikom municipality-source improvement at 45 mld wtp-improving water supply by source improvements at existing water treatment plant and capacity enhancement of 45 mld wtp at mevelloor. -general civil work
Read more100 mld wtp meerut o and m
Operation and maintenance of 100 mld wtpand feedrmain and other appurtenant works
Read moreJjm cwss to peringotukurissi and kuthanur phase iv package i augmentation of existing 6 mld wtp into 12 mld by constructing new 6.00 mld wtp excluding cw sump and pumphouse at existing manimala wtp compound.
Jjm cwss to peringotukurissi and kuthanur phase iv package i augmentation of existing 6 mld wtp into 12 mld by constructing new 6.00 mld wtp excluding cw sump and pumphouse at existing manimala wtp compound.
Read moreOperation and maintenance of 100 mld wtp at bhola ki jhal
Operation and maintenance of 100 mld wtp at bhola ki jhal
Read moreFull automation (scada) of existing 8 mld capacity wtp, raw water and pure water pumping machinery and esr at dharangaon
Full automation (scada) of existing 8 mld capacity wtp, raw water and pure water pumping machinery and esr at dharangaon
Read moreFull automation (scada) of existing 8 mld capacity wtp, raw water and pure water pumping machinery and esr at dharangaon
Full automation (scada) of existing 8 mld capacity wtp, raw water and pure water pumping machinery and esr at dharangaon
Read moreConstruction of 66 mld capacity wtp at pakni, tal. -solapur north, district - solapur
Construction of 66 mld capacity wtp at pakni, tal. -solapur north, district - solapur
Read moreUpgradation of existing external power supply system at 15 mld wtp, kantapali, bargarh
Upgradation of existing external power supply system at 15 mld wtp, kantapali, bargarh
Read more0.30 mld capacity packaged wtp for rpws scheme to village brahmanapada under chakapad block.
0.30 mld capacity packaged wtp for rpws scheme to village brahmanapada under chakapad block.
Read moreof your Industry type