Tender Details

Particulars Details
Title
Irrigation Precautionary Measure For Khatra Main Canal (Lower) From Ch. 0 To Ch. 470, Garhbeta Branch Canal From Ch. 0 To Ch. 51 And Midnapore Branch Canal Ch. 0 To Ch. 446 In Connection With Rabi Irrigation 24 (1st, 2nd, 3rd Watering)
Description
Irrigation Precautionary Measure For Khatra Main Canal (Lower) From Ch. 0 To Ch. 470, Garhbeta Branch Canal From Ch. 0 To Ch. 51 And Midnapore Branch Canal Ch. 0 To Ch. 446 In Connection With Rabi Irrigation 24 (1st, 2nd, 3rd Watering) During24
Organisation IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT
Tender Id 2024_IWD_734574_1
Reference
Number
WBIW /SDO /KCSD-IV /e-NIT-03 (e)/ 2024-25
Tender Fee 0
EMD 7475
Tender Value -
Place Sarenga,Simlapal,Garhbeta II,Binpur I
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1621931

Start Date August 22, 2024 16:30
End Date
Expired 29/08/2024

Expired 777 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Iip-crds-2025-26-replacing shutters of chalakudy branch canal, kalikkalkkunnu branch canal, aryankala branch canal and cross shutter for chalakudy branch canal at ch.0/800km

Iip-crds-2025-26-replacing shutters of chalakudy branch canal, kalikkalkkunnu branch canal, aryankala branch canal and cross shutter for chalakudy branch canal at ch.0/800km

Read more
General-iip-replacement of damaged karukutty karayamparambu branch canal shutters and cross regulator shutters at ch.0/000km and baslahem shutter at ch.1/200 km. - general mechanical work

General-iip-replacement of damaged karukutty karayamparambu branch canal shutters and cross regulator shutters at ch.0/000km and baslahem shutter at ch.1/200 km. - general mechanical work

Read more
Modernization of field channel offtakes from the ch 3 300 km lhs of no 3 distributary canal para karimbiyankode field channel in between ch 0 030 km to 0 190 km ch 0.300 km to ch 0 550 km 1080

Modernization of field channel offtakes from the ch 3.300 km lhs of no.3 distributary canal para karimbiyankode field channel in between ch 0.030 km to 0.190 km ch 0.300 km to ch 0.550 km 1080.

Read more
General kyip acp plan 2026 27 reconstruction of poolakkadavu surplus shutter at the tail end of kakkodi branch canal and maintenance of thiruvangoor branch canal shutter at ch 0 00 km. general mechanical work

General kyip acp plan 2026 27 reconstruction of poolakkadavu surplus shutter at the tail end of kakkodi branch canal and maintenance of thiruvangoor branch canal shutter at ch 0 00 km. general mechanical work

Read more
General iip crds 2025 26 rectification works to kanjirapilly branch canal between ch.0 000 km and 0 250 km -general civil work

General iip crds 2025 26 rectification works to kanjirapilly branch canal between ch.0 000 km and 0 250 km -general civil work

Read more
General action plan 2026 27annual maintanance desilting of karunagappally branch canal from ch0m to 6580m pavumba distributory from ch.0 m to 5780 m chathiyara minor from ch 0 m to 1400 m puthuchira minor from ch 0 m to 750 m and kannanchalil

General action plan 2026 27annual maintanance desilting of karunagappally branch canal from ch0m to 6580m pavumba distributory from ch.0 m to 5780 m chathiyara minor from ch 0 m to 1400 m puthuchira minor from ch 0 m to 750 m and kannanchalil

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise