Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission (Jjm) Jal Jeevan Mission 2021 24 Phase Ii Wss To Varavoor Panchayath Construction Of 9.4 Ll Ohsr General Civil Work
|
Description |
Jal Jeevan Mission (Jjm) Jal Jeevan Mission 2021 24 Phase Ii Wss To Varavoor Panchayath Construction Of 9.4 Ll Ohsr General Civil Work
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2024_KWA_684056_1 |
Reference Number |
RT-06/SE/PHC/TSR/2024-25 |
Tender Fee | 8850 |
EMD | 1 Lakh |
Tender Value | |
Place | Varavoor |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1064403 |
Start Date | August 05, 2024 22:30 |
End Date |
13/08/2024 ( Expired 328 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Civil work for construction of increasing capacity from (1x160 plus 1x100) mva to (2x160 plus 1x100) mva transformer at 220kv substation dadri greater noida
Civil work for construction of increasing capacity from (1x160 plus 1x100) mva to (2x160 plus 1x100) mva transformer at 220kv substation dadri greater noida
Read moreConstruction of internal road to stok phase ii by way of retaining wall and other allied work under district plan
Construction of internal road to stok phase ii by way of retaining wall and other allied work under district plan
Read more06/se/c-ii/r b/kmda/ w-28 (part-viii) of 2025-2026 date- 25/06/2025
Construction of a new bailey bridge both ways (to and fro journey) at lake town, vip road and salt lake connector near dakshindari. (first call).&#x0d sh -for foundation and sub-structure work.&#x0d
Read moreLabour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Labour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Read moreConstruction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur-- sitc of dg set
Construction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur. --sitc of dg set
Read moreConstruction of new shed for culinary, automated beverage and pet bottling unit in plant of pagrexco from foundation work to steel structure civil work including partition providing joinery and public health services etc distt hoshiarpur hsp_2025_030
Construction of new shed for culinary, automated beverage and pet bottling unit in plant of pagrexco from foundation work to steel structure civil work including partition providing joinery and public health services etc distt hoshiarpur hsp_2025_030
Read moreConstruction of plastic waste management unit / material recovery facility for village bagga kalan block harsha chhina, distt. amritsar, punjab appx. internal size 12.40 mt x 7.50 mt under swachh bharat mission grameen phase ii
Construction of plastic waste management unit / material recovery facility for village bagga kalan block harsha chhina, distt. amritsar, punjab appx. internal size 12.40 mt x 7.50 mt under swachh bharat mission grameen phase ii
Read moreIndependent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Read moreConstruction of storm water drain and culvert to vijayaragavapuram amudham st., (035019s328), phase - v (mig type 5th east street) (035022r1886), phase-ii, nehru nagar jamathi east side road (035027s341), anjuman street (035034r1670), bascal
Construction of storm water drain and culvert to vijayaragavapuram amudham st., (035019s328), phase - v (mig type 5th east street) (035022r1886), phase-ii, nehru nagar jamathi east side road (035027s341), anjuman street (035034r1670), bascal
Read moreBudget announcement 2023-24 57(1) (f) institute of dermatology for centre of excellence in charak bhawan at sms hospital, jaipur civil work (234.00 lacs) at p.w.d. sub dn.-sms hospital-ii, jaipur. (supply of furniture)
Budget announcement 2023-24 57(1) (f) institute of dermatology for centre of excellence in charak bhawan at sms hospital, jaipur civil work (234.00 lacs) at p.w.d. sub dn.-sms hospital-ii, jaipur. (supply of furniture)
Read moreof your Industry type