Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Nh 366 From Km 0.00 (Cortalim Junction) To Km 10.00 (Chicalim Circle) On Epc Mode In The State Of Goa Under Nh(o) Annual Plan 2023 24.
|
| Description |
Strengthening Of Nh 366 From Km 0.00 (Cortalim Junction) To Km 10.00 (Chicalim Circle) On Epc Mode In The State Of Goa Under Nh(o) Annual Plan 2023 24.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_782522_1 |
|
Reference Number |
13/1/2023_24/PWD/WDXIV/ NH/ASW/24 Dt. 24/11/2023 |
| Tender Fee | 11800 |
| EMD | 30.82 Lakh |
| Tender Value | - |
| Place | O/o Chief Engineer NH,RB, PWD, Altinho, Panaji,Goa |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | November 24, 2023 20:00 |
| End Date |
Expired
26/12/2023
Expired 1025 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of the flyover at ch. 59.200 on ranakpur highway junction and at ch 93.835 on pacific junction on pindwara udaipur section of nh 27 in the state of rajasthan on epc mode
Construction of the flyover at ch. 59.200 on ranakpur highway junction and at ch 93.835 on pacific junction on pindwara udaipur section of nh 27 in the state of rajasthan on epc mode
Read moreStrengthening of existing carriageway and curve improvement from km. 84_00 to km. 97_00 of nh 748 in the state of goa on epc mode
Strengthening of existing carriageway and curve improvement from km. 84_00 to km. 97_00 of nh 748 in the state of goa on epc mode
Read moreAuthority engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km on epc mode
Authority engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km on epc mode
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreConstruction of 4lane gf amritsar-katra connectivity of amritsar with dak expressway from mdr junction at ch.40.900 dhunda village-junction nh3 and taran taran bypass near mannawalla village ch.70.950 (km 40.900-km 70.950 pkg-2) on epc mode in punjab
Construction of 4lane gf amritsar-katra connectivity of amritsar with dak expressway from mdr junction at ch.40.900 dhunda village-junction nh3 and taran taran bypass near mannawalla village ch.70.950 (km 40.900-km 70.950 pkg-2) on epc mode in punjab
Read moreConstruction of the flyover at dedwa village at km 276.110 and kurja phanta junction at km 162.332 on barmer gandhav gujarat border section of nh 68 in the state of rajasthan on epc mode
Construction of the flyover at dedwa village at km 276.110 and kurja phanta junction at km 162.332 on barmer gandhav gujarat border section of nh 68 in the state of rajasthan on epc mode
Read moreRectification of 04 nos. blackspot and removal of 01 no. at grade junction by and construction of vup at village cheensa of nh 27, distt kota in the state of rajasthan on epc mode
Rectification of 04 nos. blackspot and removal of 01 no. at grade junction by and construction of vup at village cheensa of nh 27, distt kota in the state of rajasthan on epc mode
Read moreConstruction of kugging tinali road from km 0.00 to km 36.96 net length 36.96 kms greenfield alignment to nhsl specifications under 1448 bcc 761 brtf in aor of project brahmank in arunachal pradesh on epc mode
Construction of kugging tinali road from km 0.00 to km 36.96 net length 36.96 kms greenfield alignment to nhsl specifications under 1448 bcc 761 brtf in aor of project brahmank in arunachal pradesh on epc mode
Read moreConsultancy services for authoritys engineer for upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode
Consultancy services for authoritys engineer for upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode
Read moreof your Industry type