Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Laying/Fixing Of Paver Blocks(01)form Nehru Tiraha To Thana And Upto Stadium In Both Sides Of Main Road.(02)form Nehru Tiraha To Sarra In Both Sides Of Main Road.(03)form Nehru Tiraha To Tahsil Office In Both Sides Of Main Road.
|
Description |
Laying/Fixing Of Paver Blocks(01)form Nehru Tiraha To Thana And Upto Stadium In Both Sides Of Main Road.(02)form Nehru Tiraha To Sarra In Both Sides Of Main Road.(03)form Nehru Tiraha To Tahsil Office In Both Sides Of Main Road.
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2025_UAD_421145_1 |
Reference Number |
NIT No. 574/N.P./2025 Churhat, Dated 02.05.2025 |
Tender Fee | 13534 |
EMD | 80481 |
Tender Value | |
Place | NAGAR PARISHAD CHURHAT |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=496318 |
Start Date | May 05, 2025 16:30 |
End Date |
03/06/2025 ( Expired 25 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreLaying new drainage line in place of damaged drainage line from councillor fund in nehru nagar road no. 03 and 04 under zone no. 09 ward no. 26 in ghanshyam verma, shiv gogde and kamala tent back line in road no. 04 and 05.
Laying new drainage line in place of damaged drainage line from councillor fund in nehru nagar road no. 03 and 04 under zone no. 09 ward no. 26 in ghanshyam verma, shiv gogde and kamala tent back line in road no. 04 and 05.
Read moreSpl repair to roads in the aor of age br- ii, under ge 969 ews, job no- w-spl repair road-319 fd hosp 03 2025-26, w spl repair road-19 inf dou 02-2025-26, w-spl repair road-6 dogra-01-2025-26
Cwek/token-23/969 ews/2025-26- spl repair to roads in the aor of age br- ii, under ge 969 ews, job no- w-spl repair road-319 fd hosp 03 2025-26, w spl repair road-19 inf dou 02-2025-26, w-spl repair road-6 dogra-01-2025-26
Read moreConstruction work of cc tiles, side track and drain and cc road on both sides from the house of ajay kashyap to the house of ashok kumar saxena via gulshan kumar in ward-10 shyam enclave, veer savarkar nagar.
Construction work of cc tiles, side track and drain and cc road on both sides from the house of ajay kashyap to the house of ashok kumar saxena via gulshan kumar in ward-10 shyam enclave, veer savarkar nagar.
Read moreModification of existing road from both the main gates to control room construction of switchyard fencing stackyard and other allied works at c1-zone 132 kv substation under durgapur area office of wbsetcl
Modification of existing road from both the main gates to control room construction of switchyard fencing stackyard and other allied works at c1-zone 132 kv substation under durgapur area office of wbsetcl
Read moreLaying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Read moreProvision towards laying of 250mm dia di k-9 water supply rising main with fixing of flow meter and flow control valves etcs for loading to gsr at osap 7th bn dma in ward no.-12 of bmc, bhubaneswar
Provision towards laying of 250mm dia di k-9 water supply rising main with fixing of flow meter and flow control valves etcs for loading to gsr at osap 7th bn dma in ward no.-12 of bmc, bhubaneswar
Read moreProvision towards laying of 250mm dia di k-9 w/s rising main with connection to 600mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-2 to 5 in ward no-7 of bmc, bbsr
Provision towards laying of 250mm dia di k-9 w/s rising main with connection to 600mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-2 to 5 in ward no-7 of bmc, bbsr
Read moreProvision towards laying of 250mm dia di k-9 w/s rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-7 in ward no-6 of bmc, bbsr
Provision towards laying of 250mm dia di k-9 w/s rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-7 in ward no-6 of bmc, bbsr
Read moreof your Industry type