Tender Details
Particulars | Details |
---|---|
Title |
Repairing Fabrication N Painting Of 02 Nos. Old Pontoon To Install 1000 Gpm Pump Motor For Quick Dewatering And Smooth Activities Of Pump For Coming Monsoon 2025 At Tapin North Open Cast Project.
|
Description |
Repairing Fabrication N Painting Of 02 Nos. Old Pontoon To Install 1000 Gpm Pump Motor For Quick Dewatering And Smooth Activities Of Pump For Coming Monsoon 2025 At Tapin North Open Cast Project.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_333314_1 |
Reference Number |
PE(EnM)/TNOCP/Tender/24-25/54 |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | Tapin North OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345518 |
Start Date | March 26, 2025 20:30 |
End Date |
07/04/2025 ( Expired 14 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project
Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area
Read moreRepairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.
Repairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.
Read moreDismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 (monsoon activity no. 04 ) in kakri
Dismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 (monsoon activity no. 04 ) in kakri
Read moreDismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 in kakri project
Dismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 in kakri project
Read moreMatching of 02 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication n fitting to install additional pump at main sump for
Matching of 02 nos. motor pump with base frame fabrication/modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication n fitting to install additional pump at main sump for
Read moreRepairing/maintenance, checking/testing, painting of old pontoons (05 nos.), making of railing and grilling on each pontoon (05 nos.) and fabrication of walk-way and ladders for approach on pontoons (07 nos.) required during monsoon 2025 at bina proj
Repairing/maintenance, checking/testing, painting of old pontoons (05 nos.), making of railing and grilling on each pontoon (05 nos.) and fabrication of walk-way and ladders for approach on pontoons (07 nos.) required during monsoon 2025 at bina proj
Read moreComplete repairing and overhauling of one no 60m head 1000 gpm pump sl no 1748003172 make kirloskar fabrication and fixing of coupling guards and providing coupling spares for smooth pumping for dewatering of mines of rajhara ocp under rajhara area
Complete repairing and overhauling of one no 60m head 1000 gpm pump sl no 1748003172 make kirloskar fabrication and fixing of coupling guards and providing coupling spares for smooth pumping for dewatering of mines of rajhara ocp under rajhara area
Read moreTowards extension di and repairing anywhere and whenever is damaged and required as n when basis including all three existing ranges 6inch dia 8inch dia and 10inch dia pipes for smooth pumping at tapin north open cast project under hzb area
Towards extension di and repairing anywhere and whenever is damaged and required as n when basis including all three existing ranges 6inch dia 8inch dia and 10inch dia pipes for smooth pumping at tapin north open cast project under hzb area
Read morePartial mechanical repairing of 2000 gpm pump-motor damaged caused by miscreant at night shift installed at main sump of tapin open cast project hazaribagh area
Partial mechanical repairing of 2000 gpm pump-motor damaged caused by miscreant at night shift installed at main sump of tapin open cast project hazaribagh area
Read moreLying 550 mtrs approx. 200 mm dia. pipe with all accessories to complete third range pipe line 200 mm dia and 250 mm dia combination for ing one additional pump for effective n quick dewatering at tapin north open cast project under hazaribagh
Lying 550 mtrs approx. 200 mm dia. pipe with all accessories to complete third range pipe line 200 mm dia and 250 mm dia combination for ing one additional pump for effective n quick dewatering at tapin north open cast project under hazaribagh
Read moreof your Industry type