Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Splitter Assembly For Flue Gas Duct
|
| Description |
Splitter Assembly For Flue Gas Duct
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_588855_1 |
|
Reference Number |
CE/156/2025-26/NCTPS-I |
| Tender Fee | 0 |
| EMD | 29300 |
| Tender Value | - |
| Place | NCTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703461 |
| Start Date | August 04, 2025 23:30 |
| End Date |
Expired
18/08/2025
Expired 420 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Contract for repair, replacement and restoration of 6.6 kv 1ba bus duct
Contract for repair, replacement and restoration of 6.6 kv 1ba bus ductof unit-1, vstps
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreAdditional work of audio conference system of bihar legislative assembly, patna
Additional work of audio conference system of bihar legislative assembly, patna
Read moreSupply of control damper assembly for mill hot primary air of unit-xi boiler
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Read moreSdf 2023-24 c/o boyi sangam of durki(v) nasrullabad(m) banswada assembly constituency of kamareddy district. est cost 15.00 lakhs
Sdf 2023-24 c/o boyi sangam of durki(v) nasrullabad(m) banswada assembly constituency of kamareddy district. est cost 15.00 lakhs
Read moreImprovements to pwd randb road to ramalayam (kosgi town) from km 0/0 to 0/600 in kodangal assembly consituency in narayanpet district(2nd call)
Improvements to pwd randb road to ramalayam (kosgi town) from km 0/0 to 0/600 in kodangal assembly consituency in narayanpet district(2nd call)
Read moreSdf- 2023-24 - construction of hanuman temple in siddapur (v) of varni (m) in banswada assembly constituency of nizamabad district esst cost rs:25.00 lakhs
Sdf- 2023-24 - construction of hanuman temple in siddapur (v) of varni (m) in banswada assembly constituency of nizamabad district esst cost rs:25.00 lakhs
Read moreof your Industry type