Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Gp Office Roop Top Solar Light
|
| Description |
Gp Office Roop Top Solar Light&Amp#X0d
&Amp#X0d
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_774573_2 |
|
Reference Number |
e-N.I.T No 10 e-Tender/M-II,GP/15th FC/2024-2025 |
| Tender Fee | 500 |
| EMD | 4280 |
| Tender Value | - |
| Place | MALIOR II GRAM PANCHAYAT |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1714861 |
| Start Date | November 27, 2024 15:30 |
| End Date |
Expired
06/12/2024
Expired 658 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreInstalation of roop top solar pannel ongrid at khisma gp office under ranaghat-i dev. block
Instalation of roop top solar pannel ongrid at khisma gp office under ranaghat-i dev. block
Read moreInstallation of 6.42 kw roop top (hybrid plant) solar of old g.p office bulding
Installation of 6.42 kw roop top (hybrid plant) solar of old g.p office bulding
Read moreInstallation of roof top solar energy at gp office
Installation of roof top solar energy at gp office &#x0d
Read moreSupply, installation commissioning of 10kw solar pv roop top on grid solar power genarting system at bethuadahari i gp, nakashipara, nadia
Supply, installation commissioning of 10kw solar pv roop top on grid solar power genarting system at bethuadahari i gp, nakashipara, nadia
Read moreSupply, installation commissioning of 10kw solar pv roop top on grid solar power genarting system at bethuadahari i gp, nakashipara, nadia
Supply, installation commissioning of 10kw solar pv roop top on grid solar power genarting system at bethuadahari i gp, nakashipara, nadia
Read moreof your Industry type