Tender Details
Particulars | Details |
---|---|
Title |
Pr No 458/25 Improvement Works To Veluppadam Vettingappadam Forest Road 2nd Reach In Varandarappilly Gp
|
Description |
Pr No 458/25 Improvement Works To Veluppadam&Amp#X0d
Vettingappadam Forest Road 2nd Reach In Varandarappilly Gp
|
Organisation | Local Self Government Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2760 |
EMD | 26315 |
Tender Value | |
Place | varandarappilly Gp |
Link |
AAAAAAAAAA Login to view |
Start Date | May 20, 2025 23:30 |
End Date |
30/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge af no.1/gur-20/2025-26 comprehensive (b/r) maintenance works including joinery works incl upvc doors and windows in building no p/144 to p/153 at sekhon vihar area at af stn palam, under ge (af) gurgaon no 1
Ca no. ge af no.1/gur-20/2025-26 comprehensive (b/r) maintenance works including joinery works incl upvc doors and windows in building no p/144 to p/153 at sekhon vihar area at af stn palam, under ge (af) gurgaon no 1
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreAAAAAAAAAA
Login to viewBalance pipeline laying, road repair with allied works under proposed ground water based asuti i asuti ii and chatta gp pwss to accommodate fhtc in thakurpukur-maheshtala block under swd - i, p.h.e. dte district south 24 parganas.
Read moreUpgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read moreConst. of wbm road from samshan ghat to raipur main road in ward no 28
Const. of wbm road from samshan ghat to raipur main road in ward no 28
Read moreNew construction (hill side cutting) of shivpuri to jajal motor road in the narendra nagar constituency of district tehri garhwal (phase ii stage i) under the honble c.m announcement no. 305-2014 ( from km 0.00 to km 5.00)
New construction (hill side cutting) of shivpuri to jajal motor road in the narendra nagar constituency of district tehri garhwal (phase ii stage i) under the honble c.m announcement no. 305-2014 ( from km 0.00 to km 5.00)
Read morePr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Read moreImprovement by bm sdbc in shishu mandir nanasem motor road under gram panchayat sarmoli of munsiyari in dharchula constituency of district pithoragarh under honorable chief minister announcement no. 1435-2021 tsp
Improvement by bm sdbc in shishu mandir nanasem motor road under gram panchayat sarmoli of munsiyari in dharchula constituency of district pithoragarh under honorable chief minister announcement no. 1435-2021 tsp
Read moreAAAAAAAAAA
Login to viewJagatpur road from 0.40 k.m. to 1.184 k.m., widening strengthening under barasat highway division no. - i in the&#x0d district of north 24 parganas (2nd call)
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreof your Industry type