Tender Details

Particulars Details
Title
Dismantling Of Damaged Materials Of Bottom Portion Of Gallery Along With Supporting Structure And Repairing The Same By Fabrication And Fitting Through Old Raw Material And Also Lubrication And Exertion Of Stringer Frame Of F/B No4 At Amp Colliery.
Description
Dismantling Of Damaged Materials Of Bottom Portion Of Gallery Along With Supporting Structure And Repairing The Same By Fabrication And Fitting Through Old Raw Material And Also Lubrication And Exertion Of Stringer Frame Of F/B No4 At Amp Colliery.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_347980_1
Reference
Number
BCCL/GM/AR-1/AM (ENM)/E-TENDER/2025-26/258
Tender Fee 0
EMD 1600
Tender Value -
Place AMP COLLIERY, BARORA AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=360692

Start Date November 25, 2025 00:00
End Date
Expired 05/12/2025

Expired 309 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling of damaged from materials of bottom portion of gallery along with supporting structures and repairing the same by fabrication and fitting through old raw material and also lubrication and exertion of stringers frame of feeder breaker no 1

Dismantling of damaged from materials of bottom portion of gallery along with supporting structures and repairing the same by fabrication and fitting through old raw material and also lubrication and exertion of stringers frame of feeder breaker no 1

Read more
Dismantling of damaged iron materials of bottom portion of gallery along with supporting structures and repairing the same by fabrication and fitting through old raw materials and also fabrication and erection of stringer frame of feeder braker no -

Dismantling of damaged iron materials of bottom portion of gallery along with supporting structures and repairing the same by fabrication and fitting through old raw materials and also fabrication and erection of stringer frame of feeder braker no -

Read more
Replacement of damaged stringer frame in top roller and bottom roller by dismantling of top and bottom roller with frame and refitting the same after changing of stringer frame of feeder breaker no.-1 and 2 of amp colliery

Replacement of damaged stringer frame in top roller and bottom roller by dismantling of top and bottom roller with &#x0d frame and refitting the same after changing of stringer frame of feeder breaker no.-1 and 2 of amp colliery

Read more
Replacement of damaged stringer frame in top roller and bottom roller by dismantling of top and bottom roller with frame and refitting the same after changing of stringer frame of feeder breaker no.-4 and 5 of amp colliery.

Replacement of damaged stringer frame in top roller and bottom roller by dismantling of top and bottom roller with frame and refitting the same after changing of stringer frame of feeder breaker no.-4 and 5 of amp colliery.

Read more
Dismantling of damaged iron materials of bottom portion gallary along with supporting materials and repairing the same by fabrication of old iron materials and fabrication and fitting of stringer frame of feeder breaker no-1 muraidih, ampc

Dismantling of damaged iron materials of bottom portion gallary along with supporting materials and repairing the same by fabrication of old iron materials and fabrication and fitting of stringer frame of feeder breaker no-1 muraidih, ampc

Read more
Dismantling of head drum of unit no. 180 b/c and 181 b/c then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in raw coal section of kathara washery

Dismantling of head drum of unit no. 180 b/c and 181 b/c then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in raw coal section of kathara washery

Read more
Dewatering of u.k bottom seam laying down above m.k. seam for development of m.k. seam, mucking/de-shifting of 03 dip gallery re- supporting wherever necessary. shifting of transformers, electrical switches, cables maintain of track lines, in bhadra.

Dewatering of u.k bottom seam laying down above m.k. seam for development of m.k. seam, mucking/de-shifting of 03 dip gallery re- supporting wherever necessary. shifting of transformers, electrical switches, cables maintain of track lines, in bhadra.

Read more
A) dismantling of head sub drum size 1600 x 600 x 10 mm, repairing and installation of the same including repairing of its supporting structure and square structure of unit no. 136 shuttle belt conveyor at raw coal section b) dismantling of head drum

A) dismantling of head sub drum size 1600 x 600 x 10 mm, repairing and installation of the same including repairing of its supporting structure and square structure of unit no. 136 shuttle belt conveyor at raw coal section b) dismantling of head drum

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise