Tender Details
Particulars | Details |
---|---|
Title |
Rep. Of Both Side Brake Assembly, Brake Booster, Replacement Of Brake Shoe, With Complete Fitment. Removal And Fitment Of Cabin And Sel Tank And Cabin Mounting With Welding And Grinding With Complete Fitment Work Of Dozer Bd155 Sl. No. 13781.
|
Description |
Rep. Of Both Side Brake Assembly, Brake Booster, Replacement Of Brake Shoe, With Complete Fitment. Removal And Fitment Of Cabin And Sel Tank And Cabin Mounting With Welding And Grinding With Complete Fitment Work Of Dozer Bd155 Sl. No. 13781.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_319948_1 |
Reference Number |
AKKOCP/PE (X)/E-Tender/2024-25/52 |
Tender Fee | 0 |
EMD | 3500 |
Tender Value | |
Place | AKK OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331650 |
Start Date | October 28, 2024 14:30 |
End Date |
08/11/2024 ( Expired 197 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair of both side steering and articulate cylinder and its mounting, replacement of bushing, fitment of bg825 grader-3249 of jarangdih colliery.
Repair of both side steering and articulate cylinder and its mounting, replacement of bushing, fitment of bg825 grader-3249 of jarangdih colliery.
Read moreRep. of bucket assembly and changing of 08 nos. tooth point, rep. of adaptor by welding, grinding, along with rep. of edge segment, fabrication of battery box, ladder new making, transmission guard fabrication and dismantling, overhauling at gvp phii
Rep. of bucket assembly and changing of 08 nos. tooth point, rep. of adaptor by welding, grinding, along with rep. of edge segment, fabrication of battery box, ladder new making, transmission guard fabrication and dismantling, overhauling at gvp phii
Read moreRepairing of track frame, boss sprocket and diagonal brace with changing of under carriage assembly of bd155 dozer, sl. no.13784 of gvp ph ii ocp.
Repairing of track frame, boss sprocket and diagonal brace with changing of under carriage assembly of bd155 dozer, sl. no.13784 of gvp ph ii ocp.
Read moreRemoval dismantling of under carriage assly both side, mast assly, cabin assly, seat making, radiator and cooler assembly, compressor, compressor tank and other spares all wall related parts like sel tank etc from grounded drill icm 260 sl. no. 14
Removal dismantling of under carriage assly both side, mast assly, cabin assly, seat making, radiator and cooler assembly, compressor, compressor tank and other spares all wall related parts like sel tank etc from grounded drill icm 260 sl. no. 14
Read moreRepairing work of both side sprocket assembly, swing motor mounting plate, denting, painting of side wall and damaged steel tubes of ck 300 shovel sl. no. 737 deployed at topa ocp, kuju area
Repairing work of both side sprocket assembly, swing motor mounting plate, denting, painting of side wall and damaged steel tubes of ck 300 shovel sl. no. 737 deployed at topa ocp, kuju area
Read moreRepairing/re-welding, co-axial line boring of different eyes, repairing/fabrication and fitment of a baffle/partition plate inside the water tank, replacement of the complete sprinkling pipeline, cleaning, and painting of water sprinklers.
Repairing/re-welding, co-axial line boring of different eyes, repairing/fabrication and fitment of a baffle/partition plate inside the water tank, replacement of the complete sprinkling pipeline, cleaning, and painting of water sprinklers.
Read more1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal in
1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal
Read moreRepairing replacement of both sides rear suspension assembly repairing of centrifugal pump along with repairing of operators cabin of water sprinkler ws28 ii mc sl no 28176 under ttk ocp rajhara area
Repairing replacement of both sides rear suspension assembly repairing of centrifugal pump along with repairing of operators cabin of water sprinkler ws28 ii mc sl no 28176 under ttk ocp rajhara area
Read moreRepairing of operator cabin assembly, fuel tank assembly, hydraulic oil tank assembly with its mountings along with fitment of cabin glasses of bd155 dozers sl. no. 13718 and 13644 deployed at topa ocp, kuju area.
Repairing of operator cabin assembly, fuel tank assembly, hydraulic oil tank assembly with its mountings along with fitment of cabin glasses of bd155 dozers sl. no. 13718 and 13644 deployed at topa ocp, kuju area.
Read moreComplete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Read moreof your Industry type