Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Ring Road At Jogi Talab (Phase Ii), In South Extension Scheme, Udaipur. 7401
|
| Description |
Construction Of Ring Road At Jogi Talab (Phase Ii), In South Extension Scheme, Udaipur. 7401
|
| Organisation | UIT Udaipur | State Govt. and UT |
| Tender Id | 2024_UITUD_382941_1 |
|
Reference Number |
NIT_74 |
| Tender Fee | 4000 |
| EMD | 4.96 Lakh |
| Tender Value | - |
| Place | Udaipur |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=681882 |
| Start Date | February 22, 2024 22:20 |
| End Date |
Expired
04/03/2024
Expired 953 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of interlocking tile road from ramsingh house to dewali panchayat bhavan rav. village jogi talab. 4602
Construction of interlocking tile road from ramsingh house to dewali panchayat bhavan rav. village jogi talab. 4602
Read moreArticle. 1: control pcb set for three phase voltage stabiliser consist of control pcb, drive pcb, wir,article. 2: main control pcb 7401 for three phase voltage stabilisers
Article. 1: control pcb set for three phase voltage stabiliser consist of control pcb, drive pcb, wir,article. 2: main control pcb 7401 for three phase voltage stabilisers
Read moreAnnual rate contrcat for construction and commissioning of single phase tubewell panghat in jurisdiction of city division i udaipur of district udaipur
Annual rate contrcat for construction and commissioning of single phase tubewell panghat in jurisdiction of city division i udaipur of district udaipur
Read morePipeline extension work (110 mm hdpe) in south ansari ward
Pipeline extension work (110 mm hdpe) in south ansari ward
Read moreConstruction work of main gate at rajnagar extension point of outer ring road.
Construction work of main gate at rajnagar extension point of outer ring road.
Read moreChandrabhaga river rejuvenation project phase-ii and repair and renovation of kishansagar talab tehsil jhalrapatan district jhalawar
Chandrabhaga river rejuvenation project phase-ii and repair and renovation of kishansagar talab tehsil jhalrapatan district jhalawar
Read moreConstruction of rajarbag motorstand udaipur,gomati district,tripura. (phase-2)/construction of boundary wall and rcc cover drain with footpath
Construction of rajarbag motorstand udaipur,gomati district,tripura. (phase-2)/construction of boundary wall and rcc cover drain with footpath
Read moreStandardization of transformers phase 2 under es perambra south work code cw 6616 202627 14
Standardization of existing distribution transformer structures 100 kva 8 nos 160 kva 2 no 250 kva 1 no total 11nos
Read moreConstruction of main drainage line at kursoo rajbagh from dws to raj bagh, extension, srinagar ( phase ist )
Construction of main drainage line at kursoo rajbagh from dws to raj bagh, extension, srinagar ( phase ist )
Read moreProviding and fixing of pcc poles, straightening of phase wires, and installation of led lights at bhikshu nagar and samta nagar, bedla, udaipur. 5305
Providing and fixing of pcc poles, straightening of phase wires, and installation of led lights at bhikshu nagar and samta nagar, bedla, udaipur. 5305
Read moreof your Industry type