Tender Details

Particulars Details
Title
Upgradation Of Parks At Shakuntlam Yojna Muzaffarnagar And Kashiram Yojna And Laying Of Interlocking Tiles Near Main Gate Along 18.00 M Wide Road
Description
Upgradation Of Parks At Shakuntlam Yojna Muzaffarnagar And Kashiram Yojna And Laying Of Interlocking Tiles Near Main Gate Along 18.00 M Wide Road
Organisation U.P. Housing and Development Board | State Govt. and UT
Tender Id 2024_UPHDB_918507_1
Reference
Number
NIT 582/G-12/14 dt 13-03-2024
Tender Fee 1770
EMD 46000
Tender Value -
Place Shakuntlam Yojna Muzaffarnagar
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1587389

Start Date March 16, 2024 23:30
End Date
Expired 26/03/2024

Expired 936 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Laying of interlocking tiles in sector 2b, 3b and 3d in shakumbhari vihar yojna-8 saharanpur.

Laying of interlocking tiles in sector 2b, 3b and 3d in shakumbhari vihar yojna-8 saharanpur.

Read more
Construction work of interlocking and rcc drain on both sides of the 18.00 meter wide road from care hospital located in sector-05 of lohiapuram scheme of farrukhabad district to sector-06 adjoining lohia hospital under the infrastructure fund

Construction work of interlocking and rcc drain on both sides of the 18.00 meter wide road from care hospital located in sector-05 of lohiapuram scheme of farrukhabad district to sector-06 adjoining lohia hospital under the infrastructure fund

Read more
Renovation/ upgradation of watch tower and provision of path with interlocking tiles for patrolling from jhankar tower till main guard room under ge (af) gurgaon no. 1

Renovation/ upgradation of watch tower and provision of path with interlocking tiles for patrolling from jhankar tower till main guard room under ge (af) gurgaon no. 1

Read more
Construction of cc roads, drains and culverts in sector-5 sector-6b sector-6d sector-11a. as well as the installation of interlocking tiles and construction of drains on the side patri in sector-16 under the infrastructure fund in sikandra yojna

Construction of cc roads, drains and culverts in sector 5 sector 6b sector-6d sector-11a as well as the installation of interlocking tiles and construction of drains on the side patri in sector-16 under the infrastructure fund in sikandra yojna

Read more
Laying of interlocking tiles on kashiram avas yojana pocket roads in shakuntlam yojna,muzaffarnagar. (infratructure work)

Laying of interlocking tiles on kashiram avas yojana pocket roads in shakuntlam yojna,muzaffarnagar. (infratructure work)

Read more
Maintenance of oht side roads at shakuntlam yojna muzaffarnagar.

Maintenance of oht side roads at shakuntlam yojna muzaffarnagar.

Read more
Construction of internal roads 9.00 m wide, 12.00 m wide and 18.00 m wide in bhoomi vikas, grihsthan evam bazar yojna green field township ayodhya.

Construction of internal roads 9.00 m wide, 12.00 m wide and 18.00 m wide in bhoomi vikas, grihsthan evam bazar yojna green field township ayodhya.

Read more
Ward no. 24 const. of interlocking drain tiles in kashiram primary school

Ward no. 24 const. of interlocking drain tiles in kashiram primary school

Read more
Construction of trunk roads (36.00 m wide and 18.00 m wide) in bhoomi vikas, grihsthan evam bazar yojna (green field township) ayodhya

Construction of trunk roads (36.00 m wide and 18.00 m wide) in bhoomi vikas, grihsthan evam bazar yojna (green field township) ayodhya

Read more
Construction of trunk roads (36.00 m wide and 18.00 m wide) in bhoomi vikas, grihsthan evam bazar yojna (green field township) ayodhya.

Construction of trunk roads (36.00 m wide and 18.00 m wide) in bhoomi vikas, grihsthan evam bazar yojna (green field township) ayodhya.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise