Tender Details
About Tender
๐ Invitation For Bids: Construction Of Rcc Bridge ๐๏ธ The Public Works Roads Department, State Govt. And Ut, Invites Bids From Experienced Contractors For The Construction Of A Reinforced Cement Concrete (Rcc) Bridge Over River Dissang At Baruanagar To Mahmora, Including Approaches And Protection Work In Tingkhong Lac. ๐ ๏ธ ๐ Location: Dibrugarh ๐ Deadline: April 03, 2024, 2:00 Pm Bid Submission Fee: Inr 20,000 Earnest Money Deposit (Emd): Inr 51,68,000 The Project Involves The Construction Of A Bridge With A Total Length Of 120 Meters, Comprising Four Spans Of 30 Meters Each. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Compliance Plan For The Project's Environmental And Safety Requirements. Keywords: Rcc Bridge, Construction, Public Works Roads Department, State Government, Ut, Tender, Bid, Dibrugarh, River Dissang, Tingkhong Lac, Emd, Earnest Money DepositParticulars | Details |
---|---|
Title |
Dibrugarh/Crif/2023 24/03 Construction Of Rcc Bridge Over River Dissang At Baruanagar To Mahmora Including Approaches And Protection Work In Tingkhong Lac. Bridge Length 120m (4 X30m)
|
Description |
Dibrugarh/Crif/2023 24/03 Construction Of Rcc Bridge Over River Dissang At Baruanagar To Mahmora Including Approaches And Protection Work In Tingkhong Lac. Bridge Length 120m (4 X30m)
|
Organisation | Public Works Roads Department | State Govt. and UT |
Tender Id | 2024_PWD_37249_1 |
Reference Number |
Dibrugarh/CRIF/2023-24/03 |
Tender Fee | 6514 |
EMD | 43428 |
Tender Value | |
Place | Dibrugarh |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=63187 |
Start Date | September 13, 2024 23:30 |
End Date |
03/10/2024 ( Expired 201 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction work of rcc culvert and drain to resolve the water logging issue at hanuman chowk.
Construction work of rcc culvert and drain to resolve the water logging issue at hanuman chowk.
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreConstruction of bridge at bari umreh road over bamani river in dholpur
Construction of bridge at bari umreh road over bamani river in dholpur
Read moreCrif - construction of thadiyanpadu bridge periyar river connecting nh-185 to state road mdr in idukki district in the state of kerala civil work general civil work
Construction of thadiyanpadu bridge across periyar river connecting nh-185 to state road (mdr) in idukki district in the state of kerala - construction of bridge and amenities
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreof your Industry type