Tender Details
About Tender
๐ Invitation For Bids: Construction Of Rcc Bridge ๐๏ธ The Public Works Roads Department, State Govt. And Ut, Invites Bids From Experienced Contractors For The Construction Of A Reinforced Cement Concrete (Rcc) Bridge Over River Dissang At Baruanagar To Mahmora, Including Approaches And Protection Work In Tingkhong Lac. ๐ ๏ธ ๐ Location: Dibrugarh ๐ Deadline: April 03, 2024, 2:00 Pm Bid Submission Fee: Inr 20,000 Earnest Money Deposit (Emd): Inr 51,68,000 The Project Involves The Construction Of A Bridge With A Total Length Of 120 Meters, Comprising Four Spans Of 30 Meters Each. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Compliance Plan For The Project's Environmental And Safety Requirements. Keywords: Rcc Bridge, Construction, Public Works Roads Department, State Government, Ut, Tender, Bid, Dibrugarh, River Dissang, Tingkhong Lac, Emd, Earnest Money DepositParticulars | Details |
---|---|
Title |
Dibrugarh/Crif/2023 24/03 Construction Of Rcc Bridge Over River Dissang At Baruanagar To Mahmora Including Approaches And Protection Work In Tingkhong Lac. Bridge Length 120m (4 X30m)
|
Description |
Dibrugarh/Crif/2023 24/03 Construction Of Rcc Bridge Over River Dissang At Baruanagar To Mahmora Including Approaches And Protection Work In Tingkhong Lac. Bridge Length 120m (4 X30m)
|
Organisation | Public Works Roads Department | State Govt. and UT |
Tender Id | 2024_PWD_37249_1 |
Reference Number |
Dibrugarh/CRIF/2023-24/03 |
Tender Fee | 6514 |
EMD | 43428 |
Tender Value | |
Place | Dibrugarh |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=63187 |
Start Date | September 13, 2024 23:30 |
End Date |
03/10/2024 ( Expired 223 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreRehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)
Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)
Read moreConstruction work of rcc drain and cc road from horam house to manaoj agarwal house in mohalla khatripada in nagar palika parishad atrauli
Construction work of rcc drain and cc road from horam house to manaoj agarwal house in mohalla khatripada in nagar palika parishad atrauli
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreReplacement of 600 mm dia psc pipe to 600 mm di pipe - paichaiyar river to railway bridge west side sluice value and railway bridge east side sluice value to munnerpalam police station at suthamali head work to magalizchi nagar pumping main.
Replacement of 600 mm dia psc pipe to 600 mm di pipe - paichaiyar river to railway bridge west side sluice value and railway bridge east side sluice value to munnerpalam police station at suthamali head work to magalizchi nagar pumping main.
Read moreVertical extension of 3rd to 9th floor over the existing three storied academic building in the campus of state aided womens university at diamond harbour, in the district of south 24 parganas -- sitc ac balance work.
Vertical extension of 3rd to 9th floor over the existing three storied academic building in the campus of state aided womens university at diamond harbour, in the district of south 24 parganas -- sitc ac balance work.
Read moreWidening and strengthening from achpura-kasindra road up to nh-14 (nh-27) and construction of bridge work at ch. km-3/00.
Widening and strengthening from achpura-kasindra road up to nh-14 (nh-27) and construction of bridge work at ch. km-3/00.
Read moreof your Industry type