Tender Details
About Tender
π Renewable Energy Power Procurement Opportunity π Sjvn Ltd, Under The Aegis Of The Central Government's Ministry/Department, Is Initiating A Procurement Process For The Development Of Renewable Energy Power Projects With A Cumulative Capacity Of 600 Mw. π π The Projects Must Be Ists Connected And Include Energy Storage Systems To Ensure Firm And Dispatchable Power Supply. π Proposals Must Be Submitted By 28th May 2024, 6:00 Pm (Ist). This Is An Opportunity For Developers To Contribute To India's Renewable Energy Goals And Participate In A Significant Project That Will Enhance The Country's Energy Security. Keywords: Re Power Developers, 600 Mw Firm And Dispatchable Power, Ists Connected Renewable Energy, Energy Storage System, Sjvn Ltd, Central Govt. Ministry/Department, Renewable Energy Procurement, IndiaParticulars | Details |
---|---|
Title |
Selection Of Re Power Developers For Supply Of 600 Mw Firm And Dispatchable Power From Ists Connected Renewable Energy (Re) Power Projects With Energy Storage System In India
|
Description |
Selection Of Re Power Developers For Supply Of 600 Mw Firm And Dispatchable Power From Ists Connected Renewable Energy (Re) Power Projects With Energy Storage System In India
|
Organisation | SJVN Ltd | Central Govt. Ministry/Department |
Tender Id | 2024_SJVNL_751902_1 |
Reference Number |
SJVN/CC-Delhi/REIA/2024/FDRE-2 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | ANYWHERE IN INDIA |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1055178 |
Start Date | March 29, 2024 19:30 |
End Date |
10/09/2024 ( Expired 274 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConsultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat
Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreTariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Tariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Read moreProviding gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreSupply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp
Supply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp conveyor belt area under capex 2024-25.&#x0d
Read moreof your Industry type