Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal And Fitment Of Track Bar (02 Nos.) And Track Roller (36 Nos.) Of Ekg 5 A Shovel Sl.No. Hmb 565 Of Gidi C Colliery.
|
| Description |
Removal And Fitment Of Track Bar (02 Nos.) And Track Roller (36 Nos.) Of Ekg 5 A Shovel Sl.No. Hmb 565 Of Gidi C Colliery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_341190_1 |
|
Reference Number |
SO(X)(A)/e-NIT/32/25-26/99 |
| Tender Fee | 0 |
| EMD | 3500 |
| Tender Value | - |
| Place | Gidi-C |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353687 |
| Start Date | August 09, 2025 15:30 |
| End Date |
Expired
19/08/2025
Expired 403 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of hoist brake and swing brake system and steering system of ekg 5a shovel sl no hmb 565 at gidi c colliery
Repairing of hoist brake and swing brake system and steering system of ekg 5a shovel sl no hmb 565 at gidi-c colliery
Read moreDismantling, repairing and fitment of take-up axle, take up wheel, idler wheel, intermediate shaft housing, propel shaft housing, bearing axle and repair of both side final drive of ekg 5a shovel sl.no. hmb-565 of gidi-c colliery.
Dismantling, repairing and fitment of take-up axle, take up wheel, idler wheel, intermediate shaft housing, propel shaft housing, bearing axle and repair of both side final drive of ekg 5a shovel sl.no. hmb-565 of gidi-c colliery.
Read moreRepairing of steering system, hoist break and swing break system and l.v. ring assy. of ekg-5a shovel sl.no. hmb- 582 of gidi-a colliery.
Repairing of steering system, hoist break and swing break system and l.v. ring assy. of ekg-5a shovel sl.no. hmb- 582 of gidi-a colliery.
Read moreRepair of bucket door hinge different cracks development of swing circle of ekg-5a shovel, sl.no hmb-565 and repairing of fan guard, mud guard front and tr of dozer bd-155 sl.no. 13623 of gidi-c project.
Repair of bucket door hinge different cracks development of swing circle of ekg-5a shovel, sl.no hmb-565 and repairing of fan guard, mud guard front and tr of dozer bd-155 sl.no. 13623 of gidi-c project.
Read moreRep. of ekg 5a shovel si no. hmb-560, cil no. 2640.
Rep. of ekg 5a shovel si no. hmb-560, cil no. 2640.
Read moreRebuilding/repair of worn out 02nos. take-up wheels (float) and fitment of bushes for ekg-5a rope shovel, sl.no. hmb-575 working at lajkura ocp
Rebuilding/repair of worn out 02nos. takeup wheels (float) and fitment of bushes for ekg-5a rope shovel, sl.no. hmb-575 working at lajkura ocp
Read moreRepairing work in ekg-5a, shovel hmb-597, cil no.-3014 of aadocm
Following repairing is to be done in ekg-5a, shovel hmb-597, cil no.-3014 of aadocm, dhori area.
 (i)repairing/replacement of central journal and its housing welding. grinding and g.m. bush fitting 
 (ii)opening and fitting of hoist gear box of ekg5a
Read moreRepairing of sprocket (driving wheel)-02 nos. and repairing of crowd mechanism, bell bar and bucket eye housing of ekg-5a shovel sl.no.hmb-565 of gidi c colliery.
Repairing of sprocket (driving wheel)-02 nos. and repairing of crowd mechanism, bell bar and bucket eye housing of ekg-5a shovel sl.no.hmb-565 of gidi c colliery.
Read moreRepairing work of ekg 5a shovel sl. no. hmb-597 of aadocm of dhori area
Repairing is to be done in ekg 5a shovel sl. no. hmb-597 of aadocm of dhori area. (i)operator cabin front side and rhs window safety glasses (ii) 06 nos. coupling flange of mg set (iii) d.c. panel box with gate and railing work
Read moreof your Industry type