Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cutting And Removal Of Fallen Trees
|
| Description |
General Monsoon Preparedness Monsoon Preparedness 2023 24
Cutting And Removal Of Fallen Trees Obstructing
The Flow Of P C Canal In Edathiruthy And
Kattoor Panchayath General Civil Work
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_587929_1 |
|
Reference Number |
IRR/IA/TR/615/2022_5_9_9/1 |
| Tender Fee | 555 |
| EMD | 2687 |
| Tender Value | - |
| Place | Additional Irrigation Division Thrissur |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | July 14, 2023 23:30 |
| End Date |
Expired
19/07/2023
Expired 1138 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Removal of silt in drain in main roads and cross roads of all wards in zone 5 mysuru
Removal of silt in drain in main roads and cross roads of all wards in zone 5 mysuru
Read moreRemoval of silt and jungle clearance of lead off canal-1 and 2 of mlis for the year-2026-27
Removal of silt and jungle clearance of lead off canal-1 and 2 of mlis for the year-2026-27
Read moreReplacement of existing smoke tubes in 4tph fire tube boiler reg.no.mys-1982 including supply, removal, installation, testing, and commissioning at bengaluru dairy
Replacement of existing smoke tubes in 4tph fire tube boiler reg.no.mys-1982 including supply, removal, installation, testing, and commissioning at bengaluru dairy
Read moreRemoval of silt and jungle clearance of salawadagi main canal from 0.00km to 13.00 km at selected reaches for the year 2026-27
Removal of silt and jungle clearance of salawadagi main canal from 0.00km to 13.00 km at selected reaches for the year 2026-27
Read moreMaintenance of lawn beds, shrubs, ground cover, hedges, flower beds & trees, including sweeping, protection, operation and maintenance of garden equipments and water supply system etc, at rock garden during 2026-27.
Maintenance of lawn beds, shrubs, ground cover, hedges, flower beds & trees, including sweeping, protection, operation and maintenance of garden equipments and water supply system etc, at rock garden during 2026-27.
Read moreMaintenance of lawn beds, shrubs, ground cover, hedges and trees including sweeping and protection and water supply system to krishna garden and lava-kusha garden and other allied garden during 2026-27.
Maintenance of lawn beds, shrubs, ground cover, hedges and trees including sweeping and protection and water supply system to krishna garden and lava-kusha garden and other allied garden during 2026-27.
Read moreRemoval of silt and jungle clearance of basavan bagewadi branch canal from ch 0.00 to72.55 km including distributaries, laterals and sublateral at selected reaches for the year 2026-27.
Removal of silt and jungle clearance of basavan bagewadi branch canal from ch 0.00 to72.55 km including distributaries, laterals and sublateral at selected reaches for the year 2026-27.
Read moreRemoval of silt and jungle clearance of mli east canal from ch 0.00 to 17.22 km including distributaries, laterals and sub lateral at selected reaches for the year 2026-27
Removal of silt and jungle clearance of mli east canal from ch 0.00 to 17.22 km including distributaries, laterals and sub lateral at selected reaches for the year 2026-27
Read moreRemoval of silt and jungle clearance of mli west canal from ch 15.00 to 30.0 km including distributaries, laterals and sub lateral at selected reaches for the year 2026-27.
Removal of silt and jungle clearance of mli west canal from ch 15.00 to 30.0 km including distributaries, laterals and sub lateral at selected reaches for the year 2026-27
Read moreRemoval of silt and jungle clearance of mli west canal from ch 0.00 to 15.00 km including distributaries, laterals and sub laterals at selected reaches for the year 2026-27
Removal of silt and jungle clearance of mli west canal from ch 0.00 to 15.00 km including distributaries, laterals and sub laterals at selected reaches for the year 2026-27
Read moreof your Industry type