Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Green Space/Strip Along Tawi River By Way Of Development Of Land, Surface Dressing/Leveling, Providing And Fixing Of Tree Guards, Footpath Including Protection Works From Tawi Bridge Towards Kadir Shah Basti Upstream Side In Ward No 6
|
Description |
Construction Of Green Space/Strip Along Tawi River By Way Of Development Of Land, Surface Dressing/Leveling, Providing And Fixing Of Tree Guards, Footpath Including Protection Works From Tawi Bridge Towards Kadir Shah Basti Upstream Side In Ward No 6
|
Organisation | HAUDD | State Govt. and UT |
Tender Id | 2025_HAUDD_270312_1 |
Reference Number |
Division No. 1/JMC/2024-25/e-NIT No. 24 |
Tender Fee | 2000 |
EMD | 2.51 Lakh |
Tender Value | |
Place | Ward No. 06. |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=835191 |
Start Date | January 14, 2025 22:30 |
End Date |
31/01/2025 ( Expired 101 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new high level bridge on upstream side of existing bridge known as ahilya bridge across bhima river chainage 37.686 l 365.00 mtr along with its
Construction of new high level bridge on upstream side of existing bridge known as ahilya bridge across bhima river chainage 37.686 l 365.00 mtr along with its
 approaches and development widening strengthening of length from km 36.190 to 37.350 an
Read moreConstruction of green space/strip along tawi river by way of development of land, surface dressing/leveling, providing and fixing of tree guards, footpath including protection works from tawi bridge towards kadir shah basti upstream side in ward no-6
Construction of green space/strip along tawi river by way of development of land, surface dressing/leveling, providing and fixing of tree guards, footpath including protection works from tawi bridge towards kadir shah basti upstream side in ward no-6
Read moreConstruction of flood protection work by way of 18m long stud 6 nos. with 6m apron on right side of river nikki tawi from omman post to makwal forward post along international border at village makwal (at spots) part-a
Construction of flood protection work by way of 18m long stud 6 nos. with 6m apron on right side of river nikki tawi from omman post to makwal forward post along international border at village makwal (at spots) part-a
Read moreConstruction of flood protection work by way of revetment crates and earthen embankment on left side of river nikki tawi in firing range raipur satwari and u/s of surya chak bridge (at spots)
Construction of flood protection work by way of revetment crates and earthen embankment on left side of river nikki tawi in firing range raipur satwari and u/s of surya chak bridge (at spots)
Read moreConstruction of flood protection work by way of revetment crates and 01 nos stud at village jassore/ kalali tibba/ gujjar basti and badyal brahmana (at spots) on left side of river nikki tawi.
Construction of flood protection work by way of revetment crates and 01 nos stud at village jassore/ kalali tibba/ gujjar basti and badyal brahmana (at spots) on left side of river nikki tawi.
Read moreConstruction of flood protection work along the left side of nikki tawi from satsang ghar baba bundan ali shah school by way of construction of 01 stud at barjala khandwal (stud no 01)
Construction of flood protection work along the left side of nikki tawi from satsang ghar baba bundan ali shah school by way of construction of 01 stud at barjala khandwal (stud no 01)
Read moreConstruction of protection work upstream surya chak bridge near kargil colony by way of construction of eartheren embankment with revetment crates abd studs raising including division channel at spot on right side of river nikki tawi
Construction of protection work upstream surya chak bridge near kargil colony by way of construction of eartheren embankment with revetment crates abd studs raising including division channel at spot on right side of river nikki tawi
Read moreConstruction of flood protection work at valnerable spot by way of revetment crates and embankment d/s surya chak bridge at ram bagh kullian on right side of river nikki tawi (at spot)
Construction of flood protection work at valnerable spot by way of revetment crates and embankment d/s surya chak bridge at ram bagh kullian on right side of river nikki tawi (at spot)
Read moreof your Industry type