Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply, Installation, Testing And Commissioning Of 3 Nos. Of 120 Mt Automated Weighbridge Systems With 6 Years O And M Including 2 Years Guarantee Period On Epc Mode At Voc Port Authority
|
| Description |
Supply, Installation, Testing And Commissioning Of 3 Nos. Of 120 Mt Automated Weighbridge Systems With 6 Years O And M Including 2 Years Guarantee Period On Epc Mode At Voc Port Authority
|
| Organisation | V.O.Chidambaranar Port Trust | Public Sector Undertakings |
| Tender Id | 2025_VOCPT_232130_1 |
|
Reference Number |
SITC 120 TON WEIGHBRIDGE |
| Tender Fee | 0 |
| EMD | 5.2 Lakh |
| Tender Value | - |
| Place | VOCPA premises including inside and outside custom |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262218 |
| Start Date | April 10, 2025 15:30 |
| End Date |
Expired
20/05/2025
Expired 511 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Setting up of 120 tpd municipal solid waste processing treatment and management facility on epc and o and m basis at drcc in ramagundammunicipal corporation for a period of 5 years
Setting up of 120 tpd municipal solid waste processing treatment and management facility on epc and o and m basis at drcc in ramagundammunicipal corporation for a period of 5 years
Read moreDesign, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Design, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Read moreDesign, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Read moreProviding 120mt automated weighbridge systems on license mode at vocpa for a period of 10 years
Providing 120mt automated weighbridge systems on license mode at vocpa for a period of 10 years
Read moreDeployment of 4 numbers of new hmcs of 120 ton capacity or above at voc port operated berths on license mode for a period of 10 years
Deployment of 4 numbers of new hmcs of 120 ton capacity or above at voc port operated berths on license mode for a period of 10 years
Read moreDevelopment of bunkering and refueling facility for green methanol 750 meter cube on pilot basis including five years operation and maintenance contract through epc mode at voc port authority
Development of bunkering and refueling facility for green methanol 750 meter cube on pilot basis including five years operation and maintenance contract through epc mode at voc port authority
Read moreDeployment of 4 numbers of hmcs of not older than 10 years with 120 ton capacity or above at voc port operated berths on license mode for a period of 5 years
Deployment of 4 numbers of hmcs of not older than 10 years with 120 ton capacity or above at voc port operated berths on license mode for a period of 5 years
Read moreDeployment of 4 numbers of hmcs of not older than 10 years with 120 ton capacity or above at voc port operated berths on license mode for a period of 5 years
Deployment of 4 numbers of hmcs of not older than 10 years with 120 ton capacity or above at voc port operated berths on license mode for a period of 5 years
Read moreAmc of official website of voc port authority for two years
Amc of official website of voc port authority for two years
Read moreof your Industry type