Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ch 3 /Mp 7070/Air Flow Test/2023
|
| Description |
Services Required For Conducting Dirty Air Flow Test
Before Overhauling And Clean Air Flow Test After Overhauling Of 250 Mw, Unit7, Ptps, Panipat
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HBC_292614_1 |
|
Reference Number |
Ch-3/MP-7070/AIR FLOW TEST /2023 |
| Tender Fee | 1180 |
| EMD | 9500 |
| Tender Value | |
| Place | XEN MP1 PTPS |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | June 22, 2023 23:30 |
| End Date |
Expired
05/09/2023
Expired 1024 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hand operated pneumatic barrel pump, capacity 200lts.the specifications are (1)material construction-al,ss, ms, pvdf, telfon, polypropylene, conductive plastic carbon steel, chlorinated polyvinayl chloride.(2)max.pressure-15psi, (3)air inlet, in.npt(f)-others. (4)capacity-200lts. (5)outlet size-20mm. (6)shut of head-5mts. (7)inlet size-25mm (8)product type-hand operated (9)tube length-225mm. (10)max flow-10lpm. (11)application-for barrel emptying drum applications to remval diesel, industrial
For complete deion and other details, please refer to tender
Read moreMp-7073/air flow test/2024
Services required for conducting dirty air flow test before overhauling and clean air flow test after overhauling of 250 mw, unit-7, ptps, panipat
Read moreMp-8294/dirty air flow test...
Services required for conducting dirty air flow test before overhauling and clean air flow test after overhauling of 250 mw, unit-8, ptps, panipat
Read moreCh-9 /mp-6047/air flow test /2022
Services required for conducting dirty air flow test before overhauling and clean air flow test after overhauling of 210 mw, unit-6, ptps, panipat
Read moreMp-6109/air flow test/2024
Services required for conducting dirty air flow test before overhauling and clean air flow test after overhauling
Read moreOverhauling of flue gas/primary air/secondary air ducting of boiler of 250 mw, unit-8,
Overhauling of flue gas/primary air/secondary air ducting of boiler of 250 mw, unit-8, ptps, panipat
Read moreOverhauling of air pre heater
Overhauling of rotary air heater of boiler of 250 mw, unit-8, ptps, panipat
Read moreOverhauling of pressure parts of boiler of 250 mw unit 8 ptps panipat
Overhauling of pressure parts of boiler of 250 mw unit 8 ptps panipat
Read moreCoal mill performance optimization test (clean air test, dirty air test, isokinetic sampling for 06 nos. of coal mills,unit#5,215 mw)
Coal mill performance optimization test (clean air test, dirty air test, isokinetic sampling for 06 nos. of coal mills,unit#5,215 mw)&#x0d
Read moreCoal mill performance optimization test (clean air test, dirty air test, isokinetic sampling for 06 nos of coal mills ,unit#5 ,215 mw)
Coal mill performance optimization test (clean air test, dirty air test, isokinetic sampling for 06 nos of coal mills ,unit#5 ,215 mw)
Read moreof your Industry type