Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Upgradation Of Existing Core Flooding System (D Cam) With Co2 Mass Flow Meter, Pressure Transducer And Data Acquisition System
|
Description |
Upgradation Of Existing Core Flooding System (D Cam) With Co2 Mass Flow Meter, Pressure Transducer And Data Acquisition System
|
Organisation | Indian Institute of Technology(ISM) Dhanbad | Central Govt. Ministry/Department |
Tender Id | 2025_ISMD_849692_1 |
Reference Number |
PE-INS-CPPP-254-24-25 |
Tender Fee | 0 |
EMD | 28000 |
Tender Value | |
Place | IIT(ISM) Dhanbad |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=900749 |
Start Date | April 17, 2025 23:30 |
End Date |
28/04/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair/ maint to led street lights along with replacement of lt damaged cable including allied items and upgradation of street light system in north area under age e/m (es) at ge (u) e/m meerut cantt.
Repair/ maint to led street lights along with replacement of lt damaged cable including allied items and upgradation of street light system in north area under age e/m (es) at ge (u) e/m meerut cantt.
Read moreHigh accuracy atmospheric pressure sensor along with 6 core, shielded signal cable of 1 meter lengt
Read more
High accuracy atmospheric pressure sensor along with 6 core, shielded signal cable of 1 meter lengt
Read more
Engagement of a system integrator (si) for implementation/upgradation of scada, its integration with other systems, and associated works for jabalpur city at mppkvvcl, jabalpur under rdss
Engagement of a system integrator (si) for implementation/upgradation of scada, its integration with other systems, and associated works for jabalpur city at mppkvvcl, jabalpur under rdss
Read moreReplacement of co2 flooding system with detectors in the fire protection system
Replacement of co2 flooding system with detectors in the fire protection system
Read moreReconductoring and hotline stringing of aegcl portion of existing 220kv sonabil-balipara d/c transmission line (acsr zebra conductor) by htls conductor along with augmentation of terminal equipment
Reconductoring and hotline stringing of aegcl portion of existing 220kv sonabil-balipara d/c transmission line (acsr zebra conductor) by htls conductor along with augmentation of terminal equipment
Read moreShifting, installation, erection, testing and commissioning of 320kva dg set along with existing exhaust system from old guest house to ess 07 in iit guwahati campus
Shifting, installation, erection, testing and commissioning of 320kva dg set along with existing exhaust system from old guest house to ess 07 in iit guwahati campus
Read moreProviding and laying of rcc pipe with hdpe inner linning of 400 mm i/d due to damaged existing sewer line, construction of manholes, construction of road gullies from community centre to chawla traffic light point, phase 3b1, s.a.s. nagar and all ot
Providing and laying of rcc pipe with hdpe inner linning of 400 mm i/d due to damaged existing sewer line, construction of manholes, construction of road gullies from community centre to chawla traffic light point, phase 3b1, s.a.s. nagar and all ot
Read moreMaintenance of rehabilitation and upgradation of existing highway to 2 lane 4 lane with paved shoulder configuration from dhangarpimpri to jalna and ambad chowk to mantha chowk km 30 390 to km 50 264 and 0 000 to 5 243 two lane with paved shoulder
Maintenance of rehabilitation and upgradation of existing highway to 2 lane 4 lane with paved shoulder configuration from dhangarpimpri to jalna and ambad chowk to mantha chowk km 30 390 to km 50 264 and 0 000 to 5 243 two lane with paved shoulder
Read moreMaintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and
Maintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and
Read moreof your Industry type