Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Fixing Back Of Pipelines And Fittings For Choke Clearing At Np Plant, Fact Cd.
|
| Description |
Dismantling And Fixing Back Of Pipelines And Fittings For Choke Clearing At Np Plant, Fact Cd.
|
| Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
| Tender Id | 2024_FACT_828343_1 |
|
Reference Number |
04096/2024-2025/E30179 |
| Tender Fee | 0 |
| EMD | 12000 |
| Tender Value | - |
| Place | AMBALAMEDU |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=870422 |
| Start Date | September 28, 2024 19:30 |
| End Date |
Expired
14/10/2024
Expired 732 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supplying, fixing, testing and commissioning of ss 316l pipelines and fittings for etp plant.
Supplying, fixing, testing and commissioning of ss 316l pipelines and fittings for etp plant.
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - providing and fixing of 250 watt led flood light luminaries of periphery lighting poles/gantry installed in switchyard after dismantling of existing light fittings at va..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - providing and fixing of 250 watt led flood light luminaries of periphery lighting poles/gantry installed in switchyard after dismantling of existing light fittings at va..
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreDismantling and fixing back pipelines for choke clearing in pa/pc plants,fact cd
Dismantling and fixing back pipelines for choke clearing in pa/pc plants,fact cd
Read moreDismantling and fixing-back of pipelines and fittings for choke clearing during preventive maintenance accordance with emergency requirements at np plant, fact cd .
Dismantling and fixing-back of pipelines and fittings for choke clearing during preventive maintenance /accordance with emergency requirements at np plant, fact cd .
Read moreDismantling and fixing-back of pipelines and fittings for choke clearing during preventive maintenance / accordance with emergency requirements at np plant, fact cd.
Dismantling and fixing-back of pipelines and fittings for choke clearing during preventive maintenance / accordance with emergency requirements at np plant, fact cd.
Read moreDismantling and fixing-back of valley header line and fittings for choke clearing in bulk godown at offsite area, fact cd.
Dismantling and fixing-back of valley header line and fittings for choke clearing in bulk godown at offsite area, fact cd.
Read moreDismantling and fixing back pipelines for choke clearing in pa/pc plants
Dismantling and fixing back pipelines for choke clearing in pa/pc plants
Read moreDismantling and fixing back pipelines for choke clearing in pa/pc plants
Dismantling and fixing back pipelines for choke clearing in pa/pc plants
Read moreLeak rectification of pipelines in offsite area and np plant, fact-cd
Leak rectification of pipelines in offsite area and np plant, fact-cd
Read moreof your Industry type