Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Road Take Off From Bhella Panshai Road Km 8th To Sc Village Hakuna Via Bhattan Village Under State Sector
|
| Description |
Construction Of Road Take Off From Bhella Panshai Road Km 8th To Sc Village Hakuna Via Bhattan Village Under State Sector
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWDJK_294957_1 |
|
Reference Number |
e-NIT NO. 44 OF 2025-26 |
| Tender Fee | 600 |
| EMD | 90000 |
| Tender Value | - |
| Place | Thathri |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=954419 |
| Start Date | November 12, 2025 23:30 |
| End Date |
Expired
18/11/2025
Expired 332 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Creation of 4x25 kva distribution substations at lower pamasa near kalyan singh (bhella), rokalie chiralla), sc mohalla gurangal pyt. bari (humbal), and looni (khellani) in ut capex under the juridiction of ed doda
Creation of 4x25 kva distribution substations at lower pamasa near kalyan singh (bhella), rokalie chiralla), sc mohalla gurangal pyt. bari (humbal), and looni (khellani) in ut capex under the juridiction of ed doda
Read moreCable head termination system with vertical take off type specification :- rdso spec. elrs/spec/bl/0003 rev.1 and amend 1 dec.08 with latest rev.
Cable head termination system with vertical take off type specification :- rdso spec. elrs/spec/bl/0003 rev.1 and amend 1 dec.08 with latest rev.
Read moreSupply, installation and commissioning of dual (main and stand by) air compressor system with platform and multiple air take off point with pipe line at els/tkd.
Supply, installation and commissioning of dual (main and stand by) air compressor system with platform and multiple air take off point with pipe line at els/tkd.
Read moreConstruction of the road from raisana village turn-off to the meerut-garh road via datavali and gesupur
Construction of the road from raisana village turn-off to the meerut-garh road via datavali and gesupur
Read moreConstruction of sc community hall at chinna elkicherla(v) of kondurg (m) of rangareddy district,est cost rs.15.00 lakhs sanctioned under gp fund -8th call.
Construction of sc community hall at chinna elkicherla(v) of kondurg (m) of rangareddy district,est cost rs.15.00 lakhs sanctioned under gp fund -8th call.
Read moreRevival of off-take sluices, weir and bund repairs of theegala kunta at gandhasiri(v), mudigonda(m), khammam district (invited under earmarked works- scs are only eligible to participate)
Revival of off-take sluices, weir and bund repairs of theegala kunta at gandhasiri(v), mudigonda(m), khammam district (invited under earmarked works- scs are only eligible to participate)
Read moreCable head termination system vertical take off type for 25 kv electric locomotive as per rdso drg. no. skel-4529 and spec. no. elrs/spec./bl/003 (rev. 1 )
Cable head termination system vertical take off type for 25 kv electric locomotive as per rdso drg. no. skel-4529 and spec. no. elrs/spec./bl/003 (rev. 1 )
Read moreErection of new 66kv sc on dc line t off from 66kv sardulgarh to sangha 4.992km 0.2sq inch sc on dc towers for new 66 kv gss jhanda kalan under twl no. 193 wz 2025 26 annex b
Erection of new 66kv sc on dc line t off from 66kv sardulgarh to sangha 4.992km 0.2sq inch sc on dc towers for new 66 kv gss jhanda kalan under twl no. 193 wz 2025 26 annex b
Read moreImp. h.m.p road with footpath from k block in lic xing to basanti xing via bank off baroda xing in ward 92 zone 03
Imp. h.m.p road with footpath from k block in lic xing to basanti xing via bank off baroda xing in ward 92 zone 03
Read moreTwo years maintenance contract for railway track leading to tuna from 0 to 11 km dpa line (take off point at 2.573km at gim yard to 13.54km) including lc-1, lc-2 (from 2026-28)
Two years maintenance contract for railway track leading to tuna from 0 to 11 km dpa line (take off point at 2.573km at gim yard to 13.54km) including lc-1, lc-2 (from 2026-28)
Read moreof your Industry type