Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Recharge Shaft In Nalla Bed In Alluvial Formation.
|
| Description |
Construction Of Recharge Shaft In Nalla Bed In Alluvial Formation.
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_DGSSA_964202_1 |
|
Reference Number |
Atal Bhujal E-Tender Notice No.2/Tubewell2023-2024 |
| Tender Fee | 2360 |
| EMD | 1.27 Lakh |
| Tender Value | - |
| Place | OFFICE OF THE SENIOR GEOLOGIST GROUNDWATER SURVEYS |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | November 22, 2023 15:30 |
| End Date |
Expired
13/12/2023
Expired 1026 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read more2024 jalyukt shivar abhiyan 2.0 ( construction of recharge shaft in nalla bed in alluvial formation) (second call)
2024 jalyukt shivar abhiyan 2.0 ( construction of recharge shaft in nalla bed in alluvial formation) (second call)
Read moreConstruction of recharge shaft and recharge trench in nalla bed
Construction of recharge shaft and recharge trench in nalla bed
Read moreConstruction of recharge shaft in nalla bed (jalyukta shiyojna)
Construction of recharge shaft in nalla bed (jalyukta shiyojna)
Read moreConstruction of recharge shaft in nalla bed under jaljivan mission 2023-24
Construction of recharge shaft in nalla bed under jaljivan mission 2023-24
Read moreJsa2.0 construction of recharge shaft in nalla bed at 7 villages 100 recharge shaft in nandgaon khandeshwartaluka (3rd call )
Jsa2.0 construction of recharge shaft in nalla bed at 7 villages 100 recharge shaft in nandgaon khandeshwartaluka (3rd call )
Read moreof your Industry type